2. WIRING
2-3
2.2
Hull unit/Pre-amplifier Unit
2.2.1
Running transducer cable
Excessive stress should not be placed on the transducer cables (12 pcs.) during raise/
lower operation. Follow the procedure below to run the cables.
1. Fix the 12 transducer cables with the cable clamp [A].
Cable clamp (1)
2. Temporarily fix cable clamp [B]. Note the positions of cable in clamps [A] and [B]
as shown below.
Cable clamp (2)
3. Adjust the cable length between the cable clamps [A] and [B] as follows.
4. Adjust slack of the other ten cables so that it becomes the same as the ones ad-
justed at step 3. Tighten the cable clamps [A] and [B].
600 mm Travel type 400 mm Travel type
Length of cable between [A] (a) and [B] (a) 660 mm
580 mm
Length of cable between [A] (u) and [B] (u) 690 mm
610 mm
Cable clamp [A]
Raise/lower drive
assembly
Cable clamp [B]
Raise/lowershaft
Ex) The cable which is fixed at
(a) of the clamp [A] should be
wired to (a) of the clamp [B].
Cable
clamp [A]
Cable clamp [B]
Содержание CSH-5LMARK-2
Страница 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Страница 26: ...1 MOUNTING 1 18 This page is intentionally left blank ...
Страница 54: ...3 ADJUSTMENTS 3 8 This page is intentionally left blank ...
Страница 60: ...AP 6 ...
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ...This page intentionally left blank ...
Страница 67: ......
Страница 68: ...8 May 2013 H MAKI D 2 ...
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ...D 9 ...
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ...D 18 ...
Страница 85: ......
Страница 86: ......