background image

Splice-On-Connector Quick Reference Guide - 250 & 900

µ

m

1

2

3

4

5

6

7

8

9

Remove ferrule from 
packaging using ferrule 
transportation tool.

Place ferrule in ferrule 
holder using ferrule 
transportation tool.

Place ferrule holder 
directly into fusion splicer

Slide field fiber through 
main body connector parts 
inside packaging.  Then 
remove.

Slide included 20mm 
protection sleeve onto field 
fiber.

Load fiber into fiber holder 
leaving approximately 1.25 
inches protruding from holder.

Prepare field fiber for 
fusion splicing using 
standard procedure.

Slide splice sleeve over 
spliced fiber

Protect splice with heat 
shrink oven

Remove Transportation Tool

Slide outer housing over 
inner housing.  Inner housing 
is keyed to outer housing.

COMPLETE!

10

11

12

14

15

Slide up main body and spring.  
Place inner housing over main 
body and ferrule (for APC align 
dot with round side of inner 
housing).  Main body is keyed to 
inner housing.

Use Connector Assem-

bling Tool to snap on 

inner housing to main 

body.

13

Отзывы: