THE GORILLA
ASSEMBLY INSTRUCTIONS
Страница 1: ...THE GORILLA ASSEMBLY INSTRUCTIONS...
Страница 2: ...t as recommended by Funky Monkey Bars 8 Children should be supervised by an adult at all times 9 Installing a gym crash mat under the fall zone area of your Funky Monkey Bars would be recommended for...
Страница 3: ...cesses be performed on your Funky Monkey Bars Tighten all connections and hardware Check all protective coverings on bolts pipes edges and corners Replace if they are loose cracked or missing 3 Once a...
Страница 4: ...hysical testing The tests have been performed by independent certified structural engineers in accordance with Australian Standard for Playground Equipment AS4685 1 2014 and European Standards EN1176...
Страница 5: ...nging points of your Funky Monkey Bars not to scale 2 0 Metres clear fall zone 2 0 Metres clear fall zone not to scale Page 4 DIMENSIONS PLAN VIEW SIDE VIEW FUNKY MONKEY BARS THE GORILLA OVERALL DIMEN...
Страница 6: ...of allen key hand tighten grub screw as much as possible 2 Using other end of the allen key do one full 360 degree turn as a minimum use muscles ASSEMBLY TIPS o 360 CORRECT TIGHTENING METHOD OF RUNG B...
Страница 7: ...level square straight PLAN VIEW SIDE VIEW IT IS CRITICAL YOUR MAIN FRAME IS 100 SQUARE AND LEVEL indicative diagram shown If your frame is not straight or level remove pegs loosen grub screws re adjus...
Страница 8: ...LLATION FITTINGS 1x Spirit Level Not included Page 7 INVENTORY 50Dia x 900mm 50Dia x 2950mm 50Dia x 2950mm 50Dia x 2300mm 25Dia x 850mm 50Dia x 2300mm 4x Adj Leg Tube TUBES 2x Ladder Tube 2x Double Sw...
Страница 9: ...of the best things about a Funky Monkey Bar is the ability to add new equipment and accessories as your child and family grows You can swap or add accessories to your existing frame or add extra frame...
Страница 10: ...x Assembled Rungs from step 1 9x Rung tube Hand tighten all bolts MONKEY BAR LADDER ASSEMBLY 2 Page 9 ASSEMBLY INSTRUCTIONS LADDER BAR ASSEMBLY 1 Assemble plastic rung inserts as shown above 2 Push in...
Страница 11: ...3 4 turns FIRMLY TIGHTEN ALL RUNG BOLTS 1x Ladder Tube 50Dia x 2950mm 18x 3 4 Hand tighten all bolts Page 10 ATTACH SECOND LADDER TUBE 9x M10 Bolts 9x Washers See page 5 for correct tightening method...
Страница 12: ...bolts 7 Page 11 ASSEMBLY INSTRUCTIONS LEG ASSEMBLY INSERT RUNGS ATTACH SECOND LEG AND CARGO NET 2x M10 Bolts 2x Washers 1 Slide cargo net onto second leg tube 2 Ensure one or two hoops are between th...
Страница 13: ...n 2x Height Sticker 8 9 Tighten all grub screws on base plates 2x Base Plate D 125 Page 12 ATTACH BASE PLATES AND 1x SHORT TEE A cargo net side APPLY HEIGHT STICKERS 1x Short Tee D 101 Short tee A onl...
Страница 14: ...go hoops if required 2x 2x Short Tee D 101 Page 13 SET LADDER BAR HEIGHT 11 FIRMLY TIGHTEN ALL GRUB SCREWS AND RUNG BOLTS 8x 360 o Hand tighten grub screw A Temporary location Fully tighten all others...
Страница 15: ...Y x 2 SEE BELOW FOR DESIRED RESULT Additional short tee A Leg assembly 1 with cargo net and lower short tee Height set step 10 14 Firmly tighten all grub screws and bolts Leave short tee A loose CHECK...
Страница 16: ...TICAL TWIRLY TUBE 360 o Page 15 ASSEMBLY INSTRUCTIONS TWIRLY WHIRLY BAR ASSEMBLY ATTACH HORIZONTAL TWIRLY TUBE Fully insert twirly tube then firmly tighten all grub screws 1x Twirly Tube 50Dia x 900mm...
Страница 17: ...Y INSTRUCTIONS MAIN MONKEY BAR ASSEMBLY 180 180 1 2 1 Attach first set of legs 1 tighten all grub screws 2 Attach second set of legs 2 tighten all grub screws 1 2 For the following step the legs shoul...
Страница 18: ...Select suitable location Hammer in pegs x4 22 4x Pegs Page 17 FLIP ASSEMBLY OVER SECURE TO GROUND CRITICAL ENSURE YOUR FRAME IS 100 SQUARE AND LEVEL AS PER PAGE 6 BEFORE MOVING ONTO THE REST OF THE AS...
Страница 19: ...l fittings Leave short tees and swing hooks hand tight only for assembly adjustment later see below for spacing 23 SWING BAR ASSEMBLY x2 Page 18 ASSEMBLY INSTRUCTIONS SWING BAR ASSEMBLY 4x Swing Hooks...
Страница 20: ...e attaching Fully tighten all grub screws 24 ATTACH 2x SWING BAR ASSEMBLY 1x Base Plate D 131 1x Elbow D 125 1x Leg Tube Dia 50 x 2300mm 360 o Fully tighten all grub screws 1 2 2x Short Tee D 101 1040...
Страница 21: ...second person to stand on tube to make cargo net taught then fully tighten all grub screws 1 Ensure the cargo net gap is 1040mm apart between legs You may need to loosen top grub screws D E to slide t...
Страница 22: ...grub screws 360 o 1 2 3 Slide legs onto swing bars Fully tighten elbow grub screws 28 ATTACH LEGS x3 Swing bar Leg assemblies 1 3 from step 27 1 Check level and square 2 Hammer in all remaining pegs...
Страница 23: ...all grub screws fixing twirly whirlys to legs ATTACH TWIRLY WHIRLY BARS x4 4x Twirly whirly bars from step 18 360 o Tighten all grub screws Page 22 31 1 Ensure frame is square and level 2 Firmly tight...
Страница 24: ...evel and square swing leg is pegged down 2 Loosen the grub screw fixing the short tee to the swing leg 6 Tighten grub screw fixing the short tee to the swing leg tube Apply to all twirly whirlys 3 Pul...
Страница 25: ...sired position if applicable and tighten swing hook bolts with rachet Gorilla supplied accessory trapeze swing shown 33 Gorilla supplied accessory toddler swing shown Gorilla supplied accessory sling...
Страница 26: ...d in accordance where applicable with Australian Standards AS4685 1 ASTM Global Standards F1148 Playgrounds Equipment Standard EN1176 AUSTRALIAN MADE AND OWNED Inside all 4 legs Match other side 5 2 4...
Страница 27: ...d twice a month during play season ensure 1 Tighten all hardware grub screws nuts and bolts 2 Pegs are in place and fully secure 3 Lubricate all metallic moving parts with WD40 or Vasaline trolley and...
Страница 28: ...funkymonkeybars com www funkymonkeybars com 9 Cutting Way Yangebup WA 6164 we are social monkeys AUSTRALIAN MADE AND OWNED ABN IP Australia All Funky Monkey Bars designs are registered and protected u...