Fulton Boiler FBS Series 

FBS 01/05                                                                20 

                                                                                 

 

 

NOTE 

Before leaving the boiler unattended, the daily operating tests should be carried out to check 

the functions of all the safety interlocks. For more detailed information on the burner firing 

sequence consult the burner manufacture’s Operation and Maintenance instructions. 

 

PRACTICAL CONSIDERATIONS 

When starting up the boiler, it is prudent to minimize the thermal and mechanical stress caused by 

differential expansion of various parts of the boiler as they reach working temperature. 

The temperature of the shell is determined by the contained water/steam temperature and by the heat 

transfer rate and gas temperature. The tube temperature lies between the shell and furnace 

temperature, but is nearer the shell temperature. Since all these components are virtually the same 

length, they expend longitudinally by different amounts causing mechanical and thermal stress. 

Whilst this is catered for in mechanical design of the pressure vessel, the life expectancy of the boiler 

can be affected if the boiler is frequently heated to quickly from cold. 

When starting from cold the furnace approaches its design temperature shortly after start-up, 

whereas the tube and shell temperatures are delayed by the time taken to bring the contained water 

up to temperature. As a result, the thermal expansion is at its greatest. Additionally, the temperature 

gradient which exists between the bottom and the top of the boiler is exaggerated. This can be 

reduced by blowing the boiler down during the heat-up period. 

In practical terms, the ideal solution would be to gradually raise the temperature and pressure in the 

boiler progressively by firing the boiler on low fire for a few minutes and leaving it to ‘soak’ (e.g. 

allowing the temperatures in the boiler and water to even out by diffusion) for 20 to 30 minutes, 

blowing down the boiler, firing the boiler again for a little longer and soaking for less, and so on. 

If the boiler has been fired the day before, the large thermal mass in the boiler will maintain the 

internal temperature to a point that the boiler can be simple switched on (preferably on low fire) and 

then left to reach working temperature/pressure. 

The life expectancy of the boiler and door insulation, ignoring other factors, is proportional to the 

number of the thermal/mechanical cycles that the boiler undergoes from cold/zero pressure to 

working temperature and pressure. A boiler that is continually maintained at working pressure will last 

longer than that is constantly heated and cooled. 

 

Service Inspection of Weld Joints. 

The frequency of the safety requirement for in service inspection of the main welded joints of the 

boiler is calculated by the number of cycles since the last inspection. 

Boilers running twenty four hours a day require the shell and furnace end plate welds to be inspected 

at five year intervals and the longditudinal seam every ten years. 

Boilers that are continually heated and cooled require more frequent inspection. 

The purpose of the in-service weld inspections ins to check for: 

A.  Buried defects during manufacture that are outside acceptable limits. Because the boiler was 

100% tested during manufacture none should be found, and upon proof of 100% manufacture 

testing these tests may be waived at the discretion of the ‘competent person’. 

B.  Cracks propagating from region of the toe of the fillet weld on the shell to the tube plate weld, 

resulting from fatigue or corrosion fatigue cracking. 

These cracks would no be there after manufacture but can develop in service, they are caused by 

stress due to a combination of pressure loads, differential expansion, local temperature gradients, 

oxygen impurities in the boiler water/steam and inadequate PH (water chemistry) control. 

Differential thermal expansion and local temperature gradients all result from continuous 

pressure/temperature cycling and heating from cold too quickly. Water treatment and in particular 

oxygen corrosion are covered in Section 3. The importance of correct water treatment cannot be 

over emphasized. 

 

To achieve long trouble free boiler life: 

1.  Maintain the boiler at working pressure as long as possible. 

2.  when heating from cold do so slowly. 

3.  Maintain water treatment within the prescribed limits at all times. 

 

 

 

 

 

Содержание FB-S series

Страница 1: ...FULTON BOILER FB S SERIES INSTALLATION OPERATION MAINTENANCE MANUAL...

Страница 2: ...pment the following tests are made to assure the customer the highest standards of manufacturing a Material inspections b Manufacturing process inspections c ASME welding inspection d ASME hydrostatic...

Страница 3: ...ney requirements Water supply Valves Electrical Requirements Gas Supply Oil Supply Installation check points Cleaning Boil out of new unit 4 Controls Burner Boiler Control panel Burner 5 Operation Fit...

Страница 4: ...be highlighted It is the responsibility and duty of all personnel involved in the operation and maintenance of this equipment to fully understand the WARNINGS CUATIONS and NOTES by which hazards are...

Страница 5: ...erating and maintenance instructions are followed FB S boiler is a cylindrical vessel with horizontal tubes passing through and connected to the front and rear tube sheets The vessel contains the wate...

Страница 6: ...1 1200 Kcal kg heavy oil 10 960 kcal kg nature gas 8 900 kcal m 3 town gas 3600kcal m 3 2 Specification and dimensions are approximate the Fulton Companied reserve the right to change specifications...

Страница 7: ...g Dimensions of the boiler and the necessary clearance Model FB S 1 1 0 1 5 1 0 2 1 0 3 1 0 4 1 0 4 1 25 6 1 25 Total length mm 3324 3624 4072 4772 4956 4956 5540 Total width mm 1705 1785 2100 2196 21...

Страница 8: ...by accumulating condensation in flue F The installer should check the draft with a meter at 02 04 W C pressure 0 508 to 1 016mm with the burner off If the pressure is too low a balancing damper should...

Страница 9: ...ormation on how to prevent the presence of unwanted solids and corrosive gases Accomplishment of the above objectives generally requires proper feed water treatment before and after introduction of th...

Страница 10: ...the burner gas train and furnace while running at full input This pressure is different from the kinds of the burner used for the boiler On FB S1 1 0 to FB S3 1 0 the pressure of supply gas is 50 100...

Страница 11: ...inlet should be made using the flexible pipes supplied with the burner C One gate valve should installed to the inlet and outlet of the circulating pump separately A pressure gauge 0 60psi is needed a...

Страница 12: ...nd cleaning of the waterside of the pressure vessel should be provided during the course of initial start up The pressure vessel and the steam and return lines or hot water piping represent in effect...

Страница 13: ...irring it at all times until the chemical is completely dissolved Add the chemical slowly and in small amounts to prevent excessive heat and turbulence 3 An over flow pipe should be attached to one of...

Страница 14: ...e pressure vessel should be drained after being properly cooled to near ambient temperature Hand hole covers should be removed and waterside surfaces should be inspected for corrosion pitting or forma...

Страница 15: ...cator when fitted This lamp will illuminate and alarm sound when the water level reaches a pre determined high level The feed pump will stop When the water level falls to the normal working level the...

Страница 16: ...with a sensing device to supervise the ignition sequence prove the flame is satisfactory and finally monitor the established flame Should any fault occur either during the ignition sequence or during...

Страница 17: ...to preheat the oil to correct temperature The unit is equipped with three thermostats low temperature operating and limit A thermometer and hot oil filter are mounted together as one unit on the top l...

Страница 18: ...2 and V3 remain closed for 23 seconds while the minimum side of the gas pressure switch PS checks for an increase in pressure If no crease occurs there is no leakage past V1 and the sequence continues...

Страница 19: ...EQUENCE The burner operating sequence begins with a pre purge period on full air Fuel is then supplied to the burner at start rate and ignition initiated Start flame proving is followed by establishme...

Страница 20: ...nly Off Burner Pump Switch to the PUMP ONLY position H The feed pump should start and fill the boiler to the pump off level and then switch off NOTE If the 2nd Low Water and High Pressure Alarm Reset...

Страница 21: ...intain the internal temperature to a point that the boiler can be simple switched on preferably on low fire and then left to reach working temperature pressure The life expectancy of the boiler and do...

Страница 22: ...ter level in the boiler either by evaporation or by opening the main blowdown valve with the key provided c Observe the water level in the water level gauges and check that as the water level reached...

Страница 23: ...ed solids level to within the required limits The amount of blowdown and hence time required it dependent on the amount of TDS in the raw water supply the percentage condensate return water treatment...

Страница 24: ...d Low Water Alarm Reset switch will extinguish the alarm will cancel and the burner will start NOTE Because the burner shuts down during this test it is possible that the steam load will rapidly decre...

Страница 25: ...be within setting of low pressure and light pressure switch d Check burner air proving switch and high fire limit switch e Heavy oil fired unit oil temperature below minimum setting 4 Fuel valve inte...

Страница 26: ...nadequate flame signal or open control in the running interlock circuit 7 Interlock device inoperative or defective 8 Air in the oil lines Bleed lines Boiler will not maintain pressure 1 Check oil sup...

Страница 27: ...as soon as a leak occurs can prevent costly repairs later Check for signs of leaks on all valves and fittings and take the appropriate action Test all the boiler water level functions by evaporation...

Страница 28: ...y cutting out the defective area and replacing with new fibre ensure the correct adhesive is used r Examine the end of the burner blast tube where it extends through the door into the furnace Clean of...

Страница 29: ...itting Instructions Blowdown the boiler completely and examine all inspection holes in the boiler If any leakage is evident proceed as follow a Disassembly the crabs and cover plate and remove the ins...

Страница 30: ...e boiler instruction manual shipped with your boiler Corrosive acid and chlorine based chemicals in the atmosphere can be damaging to this boiler It is the owner s responsibility to have the boiler ro...

Отзывы: