Preparing for Installation
3
Server Handling Precautions
Caution –
Deploy the antitilt bar on the equipment rack before beginning an
installation.
Caution –
The SPARC Enterprise T5240 server weighs approximately 55 lb (25 kg).
Two people are required to lift and mount this 2U server into a rack enclosure when
using the procedures in this document.
Caution –
When completing a two-person procedure, always communicate your
intentions clearly before, during, and after each step to minimize confusion.
Related Information
■
“Input Power Information and Precautions” on page 3
■
SPARC Enterprise T5140 and T5240 Servers Getting Started Guide
■
SPARC Enterprise T5140 and T5240 Servers Getting Started Guide (DC)
Input Power Information and
Precautions
The SPARC Enterprise T5140 and T5240 servers are available in the following input
power configurations:
■
Two redundant, hot-swappable AC power supplies
Содержание SPARC Enterprise T5140
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 22: ...xx SPARC Enterprise T5140 and T5240 Servers Installation Guide July 2009 ...
Страница 63: ...Installing the SPARC Enterprise T5140 and T5240 Servers 41 ...
Страница 64: ...42 SPARC Enterprise T5140 and T5240 Servers Installation Guide July 2009 ...
Страница 128: ...106 SPARC Enterprise T5140 and T5240 Servers Installation Guide July 2009 ...
Страница 129: ......
Страница 130: ......