
Chapter 5
Replacing Cold-Swappable FRUs
5-27
13. Reconnect the cables to the motherboard:
■
Reconnect the cable marked P8 to the I/O board.
■
Reconnect the gray ribbon cable that runs along the left side of the chassis.
■
Pull the hard drive data cables through the interior wall of the chassis and
reconnect the cables to the motherboard.
14. Reconnect all cables that were removed from the rear of the server.
15. Perform the procedures described in
Section 5.3, “Common Procedures for
5.2.9
Removing the Power Distribution Board
The power distribution board (PDB) provides the circuitry that distributes power to
the other components in the system. The PDB also contains an electronic copy of the
chassis serial number (see
Section 2.3, “Obtaining the Chassis Serial Number” on
). When you replace this board, you must run certain service commands to
update the replacement PDB with the chassis serial number. The steps to perform
these service commands are provided in
Section 5.2.10, “Replacing the Power
Distribution Board” on page 5-30
Caution –
The system supplies power to the power distribution board even when
the system is powered off. To avoid personal injury or damage to the system, you
must disconnect power cords before servicing the PDB.
1. Perform the procedures described in
Section 5.1, “Common Procedures for Parts
2. Disengage both power supplies from the power distribution board.
To disengage a power supply, push the power supply latch to the right and pull the
power supply out a few inches to disengage it from the PDB (
Содержание SPARC Enterprise T2000
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 16: ...xiv SPARC Enterprise T2000 Server Service Manual April 2007 ...
Страница 18: ...xvi SPARC Enterprise T2000 Server Service Manual April 2007 ...
Страница 27: ...Preface xxv Reader s Comment Form ...
Страница 43: ...Chapter 3 Server Diagnostics 3 3 FIGURE 3 1 Diagnostic Flow Chart flowchart ...
Страница 69: ...Chapter 3 Server Diagnostics 3 29 FIGURE 3 10 Flowchart of ALOM CMT Variables for POST Configuration ...
Страница 106: ...4 12 SPARC Enterprise T2000 Server Service Manual April 2007 ...
Страница 152: ...5 46 SPARC Enterprise T2000 Server Service Manual April 2007 ...
Страница 163: ...Appendix A Field Replaceable Units A 3 FIGURE A 2 Field Replaceable Units 2 of 2 13 11 12 10 14 16 15 ...
Страница 173: ......
Страница 174: ......