
Chapter 3
Powering On the System
49
3. Using the SC console, issue the
poweroff
command.
4. Issue the
poweron
command.
5. Reconnect to the system console using the console command.
The systems displays various messages, followed by the
ok
prompt.
Verifying System Functionality
After powering on the system for the first time, you can use the SunVTS™ software
to verify the functionality and performance of any installed components, as well as
its network connections. Refer to the SunVTS documentation for more information.
sc>
poweroff -fy
SC Alert: SC Request to Power Off Host Immediately.
sc>
poweron
sc> SC Alert: Host System has Reset
sc>
console -f
Enter #. to return to ALOM.
Содержание SPARC Enterprise T2000
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 10: ...viii SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 14: ...xii SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 24: ...xxii SPARC Enterprise T2000 Server Installation Guide April 2007 Reader s Comment Form ...
Страница 26: ...xxiv SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 35: ...Chapter 1 Preparing for Installation 9 FIGURE 1 5 Locating the Locks on the Slide Rail Assembly ...
Страница 76: ...50 SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 86: ...60 SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 87: ......
Страница 88: ......