SPARC Enterprise T2000 Server Installation Guide • April 2007
FIGURE 3-1
Rear Panel Power Connectors
After the system controller boots, the system controller login prompt is displayed on
the serial console. The following example shows a partial output from the system
controller boot sequence leading to the login prompt.
CODE EXAMPLE 3-1
Sample System Controller Output
ALOM POST 1.x
Dual Port Memory Test, PASSED.
TTY External - Internal Loopback Test
TTY External - Internal Loopback Test, PASSED.
TTYC - Internal Loopback Test
TTYC - Internal Loopback Test, PASSED.
TTYD - Internal Loopback Test
TTYD - Internal Loopback Test, PASSED.
....................
Full VxDiag Tests - PASSED
Status summary - Status = 7FFF
VxDiag - - PASSED
POST - - PASSED
Power supply 0
Power supply 1
Содержание SPARC Enterprise T2000
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 10: ...viii SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 14: ...xii SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 24: ...xxii SPARC Enterprise T2000 Server Installation Guide April 2007 Reader s Comment Form ...
Страница 26: ...xxiv SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 35: ...Chapter 1 Preparing for Installation 9 FIGURE 1 5 Locating the Locks on the Slide Rail Assembly ...
Страница 76: ...50 SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 86: ...60 SPARC Enterprise T2000 Server Installation Guide April 2007 ...
Страница 87: ......
Страница 88: ......