This step is only required when upgrading or replacing non-hot-plug
components.
▶
Inform the system administrator that the server will be shut down and put
offline.
▶
Terminate all applications.
▶
Perform the required procedures described in the preliminary steps of each
upgrade or maintenance task.
▶
Shut down the server.
If the system is running an ACPI-compliant operating system (OS),
pressing the On/Off button will perform a graceful shutdown.
▶
Switch on the ID indicator on the front panel and I/O panel of the server, see
"Locating the defective server" on page 47
.
4.3
Disconnecting the power cord
4.3.1
Disconnecting the power cord (AC PSU)
Figure 2: Unlocking the cable clamp of a PSU
Basic hardware procedures
50
Upgrade and Maintenance Manual
TX2550 M5
Содержание PRIMERGY TX2550 M5
Страница 20: ...Content Upgrade and Maintenance Manual TX2550 M5 ...
Страница 106: ...Basic hardware procedures 106 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 322: ...Fans 322 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 392: ...Expansion cards and backup units 392 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 408: ...Main memory 408 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 428: ...Processor CPU 428 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 522: ...System board and components 522 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 590: ...FUJITSU Server PRIMERGY TX2550 M5 System Cabling Overview System Cabling Overview English Cable plan for May 2019 ...
Страница 631: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...