![Fujitsu PRIMERGY TX150 S7 Скачать руководство пользователя страница 71](http://html.mh-extra.com/html/fujitsu/primergy-tx150-s7/primergy-tx150-s7_operating-manual_121250071.webp)
TX150 S7
Operating Manual
71
Starting up and operation
Switching the server on and off
5.3
Switching the server on and off
V
CAUTION!
●
It nothing appears on the screen but flickering stripes after switching
on the server, switch the server off immediately (see chapter
"Troubleshooting and tips" on page 81
).
●
The On/Off button does not disconnect the server from the mains
voltage. To completely disconnect it from the mains voltage, remove
the power plug(s) from the socket(s).
●
Do not move, strike, or shake the server when it is turned on. This can
damage the hard disk in the server and cause data loss.
●
Turn the server on when the temperature is in its operating
environment range (10–35°C). For details on the operating
environment, refer to"Safety Precautions".When operating the device
outside of this operating environment, the server may operate
improperly, damage data etc.Furthermore, Fujitsu cannot be held
responsible for any related damage,malfunction, or loss of data, etc.
●
Be sure to wait for 10 seconds or more after shutdown before turning
the server on.
●
After connecting power cable, press a power supply button after it
passes for more than 10 seconds.
Switching the server on
The power-on indicator (item 2 in figure
) lights up orange
(standby mode) when the server is connected to the mains.
–
Starting up for the first time:
For the Japanese market, please refer to "
はじめにお読みください
".
Ê
Press the On/Off button (see figure
).
Ê
Insert ServerView Suite DVD 1 in the DVD drive.
Ê
Follow the on-screen instructions (see also section
server and installing the operating system with the ServerView
Installation Manager" on page 76
installing the operating system without the ServerView Installation
Manager" on page 77
).