
Figure 30: Progress bar (RAID array rebuild)
CAUTION
The system is now operational, however, data redundancy will not be
available until the RAID array rebuild is complete. Depending on the
HDD capacity the overall process can take up to several hours, in some
cases even days.
You may notice a slight performance impact during rebuild.
5.2.9
Looking up for MAC/WWN addresses
When replacing a network controller or SFP+ transceiver module, the MAC
(Media Access Control) and WWN (World Wide Name) addresses will change.
In addition to the procedures described below, MAC/WWN addresses
can also be found on the type label attached to a network controller or
system board.
Looking up MAC addresses
▶
Enter the BIOS.
▶
Select the
Advanced
menu.
Basic software procedures
70
Upgrade and Maintenance Manual
TX1310 M5
Содержание PRIMERGY TX1310 M5
Страница 14: ...Content Upgrade and Maintenance Manual TX1310 M5 ...
Страница 80: ...Power supply unit PSU 80 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 124: ...Expansion cards 124 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 156: ...Processor CPU 156 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 174: ...Front panel and front USB 174 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 216: ...System board and components 216 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 238: ...Appendix A 238 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 240: ...FUJITSU Server PRIMERGY TX1310 M5 Reference Manual Reference Manual English Cable plan for March 2022 ...
Страница 257: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT July 2021 ...