Liquid cooling (LC) kit
Please ask your local Fujitsu service center for more information.
2.3
Average task duration
Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
Step
included
Explanation
Server shutdown no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance, see
.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Before you start
RX2540 M6
Upgrade and Maintenance Manual
29
Содержание PRIMERGY RX2540 M6
Страница 8: ...Upgrade and Maintenance Manual RX2540 M6 ...
Страница 34: ...Before you start 34 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 86: ...Basic hardware procedures 86 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 120: ...Basic software procedures 120 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 232: ...Fans 232 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 328: ...Expansion cards and backup units 328 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 366: ...Processor CPU 366 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 462: ...Front panel 462 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 570: ...Appendix A 570 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 572: ...FUJITSU Server PRIMERGY RX2540 M6 System Cabling Overview System Cabling Overview English Cable Plan for June 2021 ...
Страница 581: ...10 RX2540 M6 Basic Serial Cable Plan System Board D3891 A B Rear Serial CA05950 2142 Rear Serial ...
Страница 582: ...11 RX2540 M6 Basic LTO 16x2 5 Cable Plan System Board D3891 A B PWR 6 LTO CA05950 2144 MLC1 MLC2 C0 C1 Route via CPU2 ...
Страница 584: ...13 RX2540 M6 Basic OOB 10x3 5 Cable Plan System Board D3891 A B SMB 1 10x 3 5 HDD Backplane SMB 1 CA05950 2105 SB BP ...
Страница 585: ...14 RX2540 M6 Basic OOB 12x3 5 Cable Plan System Board D3891 A B SMB1 12x 3 5 HDD Backplane SMB 1 CA05950 2105 SB BP ...
Страница 593: ...22 RX2540 M6 Power 10x3 5 Cable Plan CA05950 2112 System Board D3891 A B PWR 2 10x3 5 HDD Backplane PWR 1 ...
Страница 594: ...23 RX2540 M6 Power 12x3 5 Cable Plan CA05950 2112 System Board D3891 A B PWR 2 12x3 5 HDD Backplane PWR 1 ...
Страница 600: ...29 RX2540 M6 Power Rear 4x2 5 Cable Plan System Board D3891 A B PWR 1 4x2 5 rear HDD Backplane CA05950 2136 PWR 9 ...
Страница 601: ...30 RX2540 M6 Power Rear 2x2 5 Cable Plan System Board D3891 A B PWR 1 2x2 5 rear HDD Backplane CA05950 2137 PWR 10 ...
Страница 602: ...31 RX2540 M6 Power Internal RAID Riser Cable Plan CA05950 2110 System Board D3891 A B PWR 1 Internal RAID Riser PWR 1 ...
Страница 667: ...96 RX2540 M6 Data Dual microSD 64GB Enterprise Cable Plan Dual microSD 64GB Enterprise A B ROC CON2 Y4018 V8 ...
Страница 672: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...