Basic software procedures
5.2.15 Performing a RAID array rebuild
After replacing an HDD that has been combined into a RAID array, RAID rebuild
will be performed completely unattended as a background process.
Ê
Ensure that the RAID array rebuild has started normally. Wait until the
progress bar has reached at least one percent.
Ê
Inform the customer about the remaining rebuild time, based on the
displayed duration estimate.
Figure 32: Progress bar (RAID array rebuild)
V
CAUTION!
The system is now operational, however, data redundancy will not be
available until the RAID array rebuild is complete. Depending on the
HDD capacity the overall process can take up to several hours, in some
cases even days.
I
You may notice a slight performance impact during rebuild.
Содержание PRIMERGY RX2530 M4
Страница 22: ...Upgrade and Maintenance Manual RX2530 M4 Contents ...
Страница 34: ...34 Upgrade and Maintenance Manual RX2530 M4 Before you start ...
Страница 108: ...108 Upgrade and Maintenance Manual RX2530 M4 Basic software procedures ...
Страница 128: ...128 Upgrade and Maintenance Manual RX2530 M4 Power supply unit PSU ...
Страница 192: ...192 Upgrade and Maintenance Manual RX2530 M4 Hard disk drive HDD solid state drive SSD ...
Страница 200: ...200 Upgrade and Maintenance Manual RX2530 M4 Fans ...
Страница 322: ...322 Upgrade and Maintenance Manual RX2530 M4 Liquid cooling LC Figure 231 Routing the tubes Ê Run the tubes as shown ...
Страница 358: ...358 Upgrade and Maintenance Manual RX2530 M4 Front panel ...
Страница 436: ...436 Upgrade and Maintenance Manual RX2530 M4 Appendix A ...
Страница 438: ...438 Upgrade and Maintenance Manual RX2530 M4 Appendix B ...
Страница 439: ...FUJITSU Server PRIMERGY RX2530 M4 Reference Manual Reference Manual English Cable plan for September 2018 ...
Страница 465: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan January 2017 ...