214
Upgrade and Maintenance Manual
RX1330
M3
Expansion cards and backup units
9.5
Flash Backup Unit (FBU)
The FBU backs up the memory contents of the RAID controller in the event of
a power failure. You can install one FBU.
9.5.1
Installing an FBU
9.5.1.1
Preliminary steps
Ê
"Shutting down the server" on page 53
Ê
"Disconnecting the power cord" on page 54
Ê
"Getting access to the component" on page 55
9.5.1.2
Preparing the FBU
Figure 131: Installing the FBU in the holder (A)
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Tools:
Phillips PH1 / (+) No. 1 screw driver (for installing TFM)
Содержание PRIMERGY RX1330 M3
Страница 20: ...Upgrade and Maintenance Manual RX1330 M3 Contents ...
Страница 48: ...48 Upgrade and Maintenance Manual RX1330 M3 Important information ...
Страница 70: ...70 Upgrade and Maintenance Manual RX1330 M3 Basic hardware procedures ...
Страница 132: ...132 Upgrade and Maintenance Manual RX1330 M3 Power supply unit PSU ...
Страница 178: ...178 Upgrade and Maintenance Manual RX1330 M3 Hard disk drive HDD solid state drive SSD ...
Страница 184: ...184 Upgrade and Maintenance Manual RX1330 M3 Fans ...
Страница 222: ...222 Upgrade and Maintenance Manual RX1330 M3 Expansion cards and backup units ...
Страница 244: ...244 Upgrade and Maintenance Manual RX1330 M3 Processor CPU ...
Страница 310: ...310 Upgrade and Maintenance Manual RX1330 M3 System board and components ...