Conversion procedure
The following is the procedure to convert the server from a deskside model to a rackmount
model.
When installing or removing hardware options from the server,
turn off the server, all peripheral devices, the server monitor
module, and any other connected devices. Also unplug all
power cords. Failure to do so can lead to electric shock.
•
Contact your maintenance engineer to perform the conver-
sion.
•
For safety reasons, make sure the server is located on a sta-
ble and level surface when performing the conversion work
as the combined weight can exceed of 40kg.
•
Also, work in an open space as the rackmount must be laid
horizontally to perform the conversion.
•
Make sure that the system is operating properly before per-
forming the conversion.
•
Devices inside the server remain hot after shutdown. Wait for
approximately 10 minutes after shutdown before installing or
removing hardware options from the server.
•
Static electricity can damage the internal hardware compo-
nents. Wear a wrist grounding strap when working inside the
server.
•
Do not touch any panel circuitry. Hold the metallic areas or
the green areas of the circuit boards.
Содержание PRIMERGY PG-R1CK6
Страница 7: ...vi ...
Страница 9: ...viii ...
Страница 11: ...x ...
Страница 13: ...2 本製品の梱包物 ブラケット C 1 2 M3 ネジ 6 M4 バインドネジ 4 M4 タップタイトネジ 4 M5 ネジ 1 8 M6 ネジ 1 4 部品 名称 数量 確認 ...
Страница 15: ...4 本製品の梱包物 ...
Страница 43: ...32 付録 ...
Страница 49: ...vi ...
Страница 51: ...viii ...
Страница 55: ...4 Ensuring the package ...
Страница 83: ...32 Conversion procedure ...
Страница 85: ...34 ...