24
U41271-J-Z156-2-76
Installing the Rack Model in the Rack
Installation
–
The form of the rack support uprights must ensure the frontal screwing on of
the telescope rails.
–
in connection with so-called assembly brackets frontally bolted telescopic
rails or sliding rails.
These assembly brackets and/or the sliding rails are provided with a linear
alignment possibility to ensure also an adjustment to different rack depths.
–
no support of the cable management (delivered with the mounting kit).
–
Climatic conditions.
For the ventilation of the installed server a large extent unhindered air intake
in the rack front and air discharge in the rear cover of the rack are necessary.
In principle the ventilation concept plans that the necessary cooling is
reached by the horizontal self-ventilation of the installed devices (air flow
from the front to the rear).
–
Power supply.
For the installation in 3rd-Party Racks it is to be made certain that appro-
priate socket strips are present.
3.4.2
Mounting in the PRIMECENTER Rack
For mounting the server in the PRIMECENTER Rack the following parts from
the rack mounting kit are necessary:
–
support bracket
–
two telescopic rails (assembled)
–
four assembly brackets (VL; VR; HL; HR)
–
eight mounting springs (figure 8 on page 29)