3.5.3
Generation Management Volume (SDV) Creation
Create a generation management volume in the backup RAID group.
Create SDV for seven generations (as a backup area for seven days a week) in the backup RAID group "RG1"
created in
"3.5.1 RAID Group Creation" (page 50)
Figure 3.9 Generation Management Volume (SDV) Creation
Backup RAID group (RG1)
Generation management volume
sdv0 - sdv6
(Snap Data Volume)
RAID5 (2+1)
2TB
2TB
2TB
The procedure to create a generation management volume (SDV) is as follows:
1
Click the [Volume] tab on the navigation of the ETERNUS Web GUI screen.
The [Volume] screen appears.
2
In [Action], click [Create].
The [Create Volume] screen appears.
3
Set the required items in the [Create Volume] screen and click the [Create] button.
Name: sdv
Type: Snap Data Volume
Capacity of source volume: 1TB (*1)
RAID Group / TPP Selection: Manual
Manual Setting: RG1
Number of Volumes: 7 (*2)
*1:
Enter the capacity of the copy source volume during creation of SDV.
*2:
If "7" is specified for the number of volumes, sdv0, sdv1, sdv2, sdv3, sdv4, sdv5, and sdv6 volumes
are created.
Chapter 3 General Settings
3.5 RAID Configuration Settings
55
FUJITSU Storage ETERNUS DX500 S3/DX600 S3 Disk storage system Configuration Guide (Basic)
Copyright 2014 FUJITSU LIMITED
P3AM-7732-05ENZ0
Содержание Eternus DX500 S3
Страница 2: ...This page is intentionally left blank ...
Страница 151: ......