Chapter 3 Volume Management
3.7 TPV Management
ETERNUS Web GUI User’s Guide (Settings)
Copyright 2015 FUJITSU LIMITED
P2X0-1270-13ENZ0
290
The procedure to start optimizing TPV/FTV capacity is as follows:
Procedure
1
Select which volumes to start optimization for (multiple selections can be made), and click
[Optimize TPV/FTV Capacity] in [Action].
A confirmation screen appears.
2
Click the [OK] button.
The optimization of the TPV capacity or the FTV capacity starts.
3
Click the [Done] button to return to the [Volume] screen.
End of procedure
3.7.4
Cancel Optimizing TPV/FTV Capacity
This function stops optimizing TPV/FTV capacity.
•
Even if the selected type is "FTV", if the usage of the volume is "System", [Optimize TPV/FTV Capac-
ity] cannot be clicked.
•
When the controller firmware is being applied, an error screen appears. Check the parameter
settings.
•
TPV/FTV capacity optimization cannot be suspended and restarted (restarting capacity optimization from
where it was stopped). If TPV/FTV capacity optimization is stopped and then started again, the TPV/FTV
capacity optimization process starts from the first volume at the top again.
•
This function cannot release the volumes that are reserved for TPV/FTV capacity optimization. The
reservation status of TPV/FTV capacity optimization is released only when RAID migration is stopped.
•
This function cannot be performed when the storage system status is "Not Ready".
The progress of TPV/FTV capacity optimization can be checked with "Process" on the [Volume] screen. Refer to
"Volume (Basic Information)" in "ETERNUS Web GUI User’s Guide (Operation)" for details.
Содержание Eternus DX200F
Страница 2: ...This page is intentionally left blank ...
Страница 1082: ......