
U41169-J-Z156-4-74
83
Installation
Switching the Subsystem ON/OFF
11.13 Switching the Storage Subsystem ON/OFF
The PRIMERGY SX30 storage subsystem can be switched ON or OFF via its
own operating switch or via TerminationPower of the controller in the server.
V
CAUTION!
If the storage subsystem is not switched ON by a connected server, the
storage subsystem must always be switched ON before the connected
server.