16-18
16.2 Processing Solution Replenishment System
Installation
Installation is essentially in the reverse order of removal.
NOTE: • Align the lower end of the sensor with the bottom
bearing as shown.
• Align the "
" mark on the sensor flange with the
"
" mark on the tank as shown.
When servicing the power input section parts, make
sure the built-in circuit breaker and the main power
supply on the power distribution board are both set to
the OFF position. If the main power is left ON,
electricity will flow as far as the power input section,
and this can cause electric shocks and/or short-
circuiting.
Removal
1. Remove:
• Processor rear cover
.
• PSR pump bracket
.
2. Remove the two screws and then the power input
section cover.
LII727
Sensor
Bearing
" "Marks
16.2.10
PSR Tank Replacement
LII314
Screws (2)
Power Input Section Cover