2-3
2
2.2 Regular Maintenance and Inspection Table
Implementation Period (Every)
Item
6 months
year
2 Years
3 Years
5 Years
Refer to
Scanner
Lens
Clean
Mouse
Clean
Auto Film Carrier
Inspect
Floppy Disk Drive
Inspect
CD-ROM Drive
Inspect
Printing Functions
Inspect
Carrier Base Slider Rails
Clean
Carrier Base Slide Guides
Replace
Carrier Base Plug-in Connector
Replace
Main Control Unit Backup Battery
Replace
Power Supply Cord
Clean
Printer/
Processor
Magazine Rollers
Inspect
Cutters
Inspect
Replace
for
inspection
for upper cutter
replacement
for lower cutter
replacement
Back Printer Head
Inspect
Replace
for
inspection
for
replacement
Registration Section Feed Rollers
Clean
Nip Release System (before exposure)
Inspect
Sub-scanning Section Rollers
Clean
Steel Belt
Replace
Rubber Belt
Replace
Cam Followers (Rubber Bearings)
Replace
Distribution Pipe Slider
Inspect
Distribution Section Nip Release
System/Rollers
Clean
Laser Optical Unit Air Filter
Replace
Processing Rack Helical Drive Gears
Grease
P1R, P2RA, P2RB Pump Output/
Leaks
Inspect
PSR Pump Output/Leaks
Inspect
PSR Pump Bellows/Valve
Replace
for
bellows
for
valve
Crossover Rack Auto Washing Nozzle Inspect
Dryer Entrance Rack Auto Washing
Nozzle
Inspect
PS Tank Separate Plate Blade/Seal
Replace
Circulation Pumps
Inspect
Processing Solution Heaters
Inspect
Processing Solution Level Sensors
Clean
Replenisher Level Sensors
Clean
PS4 Solution Concentration Sensor
Clean
Waste Solution Level Sensor
Clean
PSR Level Sensor
Inspect
Processing Solution Temperature
Sensors
Calibrate
Solution Hoses/Clamps
Inspect
Processor Drive Chain
Grease
Dryer Mesh Belt
Inspect
Drive Timing Belt Tension
(Dryer Rack, Dryer Exit and Print
Sending Units)
Inspect/
Adjust
for
Dryer rack unit
for dryer exit unit
for
print sending unit
Print Sending Feed Belt Tension
Inspect
Sorter Drive Chain Tension
Inspect
for
SU1400AY
for
SU2400AY
SU1400AY/SU2400AY Transverse
Sorter
Belt Tension
Inspect
for
SU1400AY
for
SU2400AY
SU1400AY/SU2400AY Sorter Stop
Position
Inspect
for
SU1400AY
for
SU2400AY