55
Process connection
Ensure a space of about 500mm against the cover in order to facilitate check, adjustment,
etc.
Grasp the hexagon part of vent/drain plug and rotate it to remove.
Bind vent/drain plug’s thread with new seal tape and mount vent/drain plugs to new process
connections.
Tightening torque : 25N·m (2.5kgf·m) <18ft·lb>
500
500
Check space
Change of vent/drain plug position