FSP EssenSolar CFS model User Manual
www.fsp-group.com.tw
16
27.5V
28V
28.5V
29V
Available options in 5kVA model:
Battery fully charged
48V
49V
50V
51V
52V
53V
54V (default)
55V
56V
57V
58V
16
Charger source priority:
To configure charger
source priority
If this inverter/charger is working in Line, Standby or Fault mode,
charger source can be programmed as below:
Utility first
Utility will charge battery as first priority.
Solar energy will charge battery only when
utility power is not available.
Solar first
Solar energy will charge battery as first
priority.
Utility will charge battery only when solar
energy is not available.
Solar and Utility
(default)
Solar energy and utility will charge battery at
the same time.