Installation Introduction 

I. Site Preparation 

When a suitable installation location is identified, you will need to determine if the system will be mounted 

horizontally as recommended, or vertically if necessary (if mounting vertically, the outlet will need to be at 

the top and a TRV is required). Allow adequate space for the ongoing maintenance and pre-plan the 

plumbing so that the ports will be facing up. 

II. Mounting 

When mounting the system on a wall, mark out the approx. location of each wall bracket. Fix a bracket to 

the wall and using a level and ruler, mark out the appropriate location for the second bracket. Brackets 

should ideally have the pivot/hinge at the bottom and screw to close the bracket at the top. Hold the 

Chamber in firmly to the brackets and they do up one of the clamps to secure the system. A second set of 

hands can assist to make this easier. 

III. Installing Connections 

The UV systems are manufactured with male BSP threads either in 1” (GT7-8K/9K/16K) or ½” (GT7-4K). 

The smaller GT7-2K unit is ¼” Female. Use appropriate plumbing fittings to install onto the chamber for 

adapting to your plumbing. 

IV. Thermal Relief Valve 

A Thermal Relief Valve is a valve with a build in sensor that will open and drain water once the temperature 

in the chamber reaches 56°C. 
A Thermal Relief Valve is also recommended on installations where there can be prolonged periods of time 

without water flow. Generally lower wattage systems (<40W) do not reach extreme temperatures under 

normal conditions; however, it is best to install a TRV to limit the temperature.   
When installing a TRV, note the below requirements: 

  The TRV must be installed on the Outlet of the UV System (which should be the open end). 

  The TRV tube must be allowed to drain freely without head pressure (don’t run the tubing vertically). 

  The TRV operates from temperature so always have the ports facing up (heat rises). 

  When vertical system installation is required, make sure the valve itself is also facing up. 

The valve will open at 56°C and Close at ~ 54 – 55°C, if you have a pump without a bladder and a very 

sensitive high/low pressure switch, you may notice the pump cycling as the valve activates/deactivates 

during prolonged periods without flow. 

V. Filter Protection 

As per Australian Plumbing Codes, a pressure limiting valve should be installed to limit the pressure to 500 

kPa when the feed pressure exceeds 500 kPa. If Water Hammer is present, install a suitable Water 

Hammer Arresting device. 

Commissioning & Start-up 

I. Quartz Thimble Installation 

Due to the fragile nature of the quartz, care must be taken when handling and installing the thimble and 

lamp. The below steps are for horizontal installations. 

1.  Remove the knurled nut from the end of the SS chamber. 

2.  Wearing clean gloves or handling with a micro-fibre cloth, remove the thimble from the packaging 

and check for any marks or blemishes. Insert the glass thimble into the 

chamber at the open end. The thimble will need to go into the chamber 

by the domed end first. At the rounded end of the UV SS chamber, you 

will find a locating port to accommodate the dome end of the quartz tube 

(On the GT7-8K/9K System, this will be a spring). Carefully push the 

quartz thimble into this port so the lamp is securely seated. 

Содержание GT7-16K

Страница 1: ...ements 3 VI What is Ultraviolet Sanitation 3 VII Example Applications 3 Installation Introduction 4 I Site Preparation 4 II Mounting 4 III Installing Connections 4 IV Thermal Relief Valve 4 V Filter P...

Страница 2: ...must be followed closely to prevent serious personal injury Ensure eye protection is worn when servicing and installing this unit to protect from harmful UV C Radiation This radiation can be harmful...

Страница 3: ...ounding plumbing must be earthed to prevent electrolysis which will cause corrosion VI What is Ultraviolet Sanitation Ultraviolet sanitation works by breaking down the cell wall of a micro organism al...

Страница 4: ...to install a TRV to limit the temperature When installing a TRV note the below requirements The TRV must be installed on the Outlet of the UV System which should be the open end The TRV tube must be a...

Страница 5: ...ure indicator light along with an audible alarm should there be a fault The ballast will automatically reset when turned on off GT7 16K PS In order to guarantee user safety this ballast features compl...

Страница 6: ...as waterproof 6 Connect the earth wire to the lug on the bottom of the UV chamber as shown above 7 Plug the ballast into a certified single socket surge protector then into a 240V 10A GPO 8 Turn on t...

Страница 7: ...PS 10W 40W AU Certified RCM Ballast to Suit 4 Pin Lamps GT7 16K PS 33W 120W AU Certified RCM Ballast to Suit 4 Pin Lamps Mounting Clamps GT11 8G 1 PC Plastic Mounting Clamp Suitable for U Sink Instal...

Страница 8: ...check for Water ingress from either rain or leaks or any signs of moisture or condensation in around the electricals Due to the elevated temperature of the lamp high humidity may cause condensate to f...

Страница 9: ...ff check connections and turn back on to see if it fixes the alarm 2 The ballast could have a problem with the lamp failure protection and may require replacement Turn the system off check connections...

Страница 10: ...buyer is responsible for keeping record and proof of installation in the form of an invoice and or receipt UV Systems must be connected to a surge protector Directly before being connected to 240V so...

Страница 11: ...of invoice Power Supply 1 Year GT7 8K GT7 9K GT7 16K Stainless Steel UV Reactor Chamber 10 Years Quartz Thimble 1 Year Pro Rata from date of invoice UV Lamp 1 Year Pro Rata from date of invoice Power...

Отзывы: