voltage transformers must be connected to terminals 1, 2, 3 and N at the point of
direct voltage measurement.
Connecting the
data communic-
ation cable to
the inverter
Connect the data communication connections of the Fronius Smart Meter TS to
the Modbus interface of the Fronius inverter using a network cable (type CAT5
or higher).
Several Smart Meters can be installed in the system, see chapter
To avoid interference, the terminating
resistor must be used (see chapter
Connecting the terminating resistor
on page
).
IMPORTANT!
More information on successful commissioning.
Note the following information about connecting the data communication cable
to the inverter.
-
Use network cables of type CAT5 or higher.
-
Use a mutual twisted cable pair for corresponding data lines (D+/D-, M1+/
M1-).
-
If the data lines are close to the mains cabling, use wires or cables that are
designed for 300 to 600 V (never less than the operating voltage).
-
Use double-insulated or sheathed data lines when they are close to bare con-
ductors.
-
Use shielded twisted pair cables to avoid faults.
-
Two wires can be installed in each terminal; the wires are twisted first, inser-
ted into the terminal and tightened.
Note:
A loose wire can disable an entire area of the network.
-
The data communication connections of the Fronius Smart Meter TS are
electrically isolated from hazardous voltages.
Terminating res-
istors - Explana-
tion of symbols
Inverter in the system
e. g. Fronius Symo
Meter - Fronius Smart Meter TS
Terminating resistor R 120 Ohm is set with a wire jumper between
M-
and
T
.
23
EN
Содержание TS 5kA-3
Страница 2: ......
Страница 4: ...Fronius manufacturer s warranty 46 4...
Страница 5: ...Safety rules 5...
Страница 6: ...6...
Страница 9: ...General information 9...
Страница 10: ...10...
Страница 15: ...Installation 15...
Страница 16: ...16...
Страница 37: ...Start up 37...
Страница 38: ...38...
Страница 43: ...The Fronius Smart Meter TS is configured as a secondary meter 43 EN...
Страница 47: ...47 EN...
Страница 48: ......