Cabling
IMPORTANT!
Always switch off the power supply before connecting the mains voltage inputs
to the Fronius Smart Meter TS.
Recommended thickness of stranded mains voltage cables for the terminals of
the measuring input and measuring output:
-
Wire: 1 - 4 mm²
-
Recommended torque: max. 0.6 Nm
The measuring inputs of the current transformers must be earthed on one side
as shown in the circuit diagram.
Connect each voltage cable to the terminal strip as shown in the graphics below.
1 phase, 2 conductors (CT connection)
1 phase, 2 conductors (VT/CT connection)
19
EN
Содержание TS 5kA-3
Страница 2: ......
Страница 4: ...Fronius manufacturer s warranty 46 4...
Страница 5: ...Safety rules 5...
Страница 6: ...6...
Страница 9: ...General information 9...
Страница 10: ...10...
Страница 15: ...Installation 15...
Страница 16: ...16...
Страница 37: ...Start up 37...
Страница 38: ...38...
Страница 43: ...The Fronius Smart Meter TS is configured as a secondary meter 43 EN...
Страница 47: ...47 EN...
Страница 48: ......