Location of the primary meter in the consumption branch. *Terminating resistor R 120 Ohm
Location of the primary meter at the feed-in point. *Terminating resistor R 120 Ohm
The following must be observed in a multi-meter system:
-
Connect the primary meter and the battery to different channels (recom-
mended).
-
The remaining Modbus participants must be distributed equally.
-
Only assign each Modbus address once.
-
Terminating resistors must be positioned individually for each channel.
Menu - Measured
variables
Image
Scree
n
Description
00
1
.
Total active energy drawn*
2
.
Total efficiency
30
Содержание TS 5kA-3
Страница 2: ......
Страница 4: ...Fronius manufacturer s warranty 46 4...
Страница 5: ...Safety rules 5...
Страница 6: ...6...
Страница 9: ...General information 9...
Страница 10: ...10...
Страница 15: ...Installation 15...
Страница 16: ...16...
Страница 37: ...Start up 37...
Страница 38: ...38...
Страница 43: ...The Fronius Smart Meter TS is configured as a secondary meter 43 EN...
Страница 47: ...47 EN...
Страница 48: ......