Fronius Tauro 50-3 Скачать руководство пользователя страница 1

Fronius prints on elemental chlorine free paper (ECF) sourced from certified sustainable forests (FSC).

/ Perfect Charging / Perfect Welding / 

Solar Energy

Fronius Tauro 50-3
Fronius Tauro ECO 50-3
Fronius Tauro ECO 99-3
Fronius Tauro ECO 100-3

EN

Operating instructions

42,0426,0307,EN 017-23112021

Содержание Tauro 50-3

Страница 1: ...aper ECF sourced from certified sustainable forests FSC Perfect Charging Perfect Welding Solar Energy Fronius Tauro 50 3 Fronius Tauro ECO 50 3 Fronius Tauro ECO 99 3 Fronius Tauro ECO 100 3 EN Operating instructions 42 0426 0307 EN 017 23112021 ...

Страница 2: ......

Страница 3: ...Cooling of the inverter through forced air ventilation 17 Power derating 17 Control elements and connections 18 Controls and displays 18 PV connections Tauro 50 3 D direct 18 PV connections Tauro Eco 50 3 D direct 19 PV connections Tauro Eco 99 3 D 100 3 D direct 19 PV connections pre combined 19 Optional DC disconnector lock 20 Mounting option for third party components 20 Data communication area...

Страница 4: ... strings for the direct version 47 Connecting PV cables MC4 connector 48 MC4 connector cover 48 Connecting PV cables Pre combined 49 Connecting cables with a cable lug 50 Replacing the string fuses 50 Closing and switching on the inverter 52 Connecting the data communication cable 54 Modbus participants 54 Permitted cables for the data communication area 54 Multiple inverters in one network 55 Rou...

Страница 5: ...ement settings 2 relays 78 Connection diagram 1 relay 79 I O power management settings 1 relay 80 Appendix 81 Status codes and remedy 83 Status Codes 83 Technical data 84 Tauro 50 3 D 50 3 P 84 Tauro Eco 50 3 D 50 3 P 85 Tauro Eco 99 3 D 99 3 P 87 Tauro Eco 100 3 D 100 3 P 89 Explanation of footnotes 91 Integrated DC disconnector 91 Applicable standards and guidelines 93 CE mark 93 WLAN 93 Power f...

Страница 6: ...trical installations and Read and follow these Operating Instructions carefully In addition to the Operating Instructions all applicable local rules and regulations regard ing accident prevention and environmental protection must also be followed All safety and danger notices on the device Must be kept in a legible state Must not be damaged Must not be removed Must not be covered pasted or painted...

Страница 7: ...n When installing devices with openings for cooling air ensure that the cooling air can enter and exit unhindered through the air ducts Only operate the charger in accordance with the degree of protection shown on the rating plate Noise emission values The sound power level of the inverter is specified in the Technical data The device is cooled as quietly as possible with the aid of an electronic ...

Страница 8: ...otection class 1 device When connecting the PE conductor en sure that it is secured against accidental disconnection All points listed under Connect ing the inverter to the public grid AC side must be observed including the use of wash ers screw locks and nuts with the defined torque It must be ensured that when using the strain relief devices the ground conductor is the last to be disconnected in...

Страница 9: ...General information 9 ...

Страница 10: ...10 ...

Страница 11: ... can be fed directly from the in verter to another inverter Several Tauro inverters up to an output power of max 200 kW can be thereby be quickly connected to one another The minimum cable cross section is defined by the fuse at the mains connection point A larger cable cross section can be selected at any time The applicable national standards must be taken into account and applied String fuses O...

Страница 12: ...chapter Installation with the app on page 58 or Installation using the web browser on page 59 Prerequisites for configuration Internet connection download min 512 kBit s upload min 256 kBit s User account on solarweb com Completed configuration via the setup wizard The information given does not constitute an absolute guarantee of faultless function High error rates in the transmission reception f...

Страница 13: ... warning no tices and safety symbols must not be removed or painted over They warn against incor rect operation as this may result in serious injury and damage A 4 digit number coded production date is printed at the very bottom of the rating plate from which the production date can be calculated If you subtract the value 11 from the first two digits you get the production year The last two digits...

Страница 14: ...ls it is bypassed and the other inverters continue op erating If a second inverter secondary device or the inverter primary device fails the operation of the entire WSD chain is interrupted For installation see WSD wired shutdown on page 57 Central grid and system protec tion The inverter offers the option to use the integrated AC relays as coupling switches in conjunction with a central grid and ...

Страница 15: ...e surge protective device is triggered the colour of the indicator changes from green to red mechanical display There is the option of a digital indication when an SPD has tripped For setting this function see PDF Temporary SPD Triggering in the Service Support area at www fronius com IMPORTANT After setting the function described above the inverter will also respond if the 2 pole sig nal cable of...

Страница 16: ...ot be liable for any damage resulting from such use All war ranty claims will be forfeited Intended use also includes complying with all the instructions in the Operating Instruc tions Regulations gov erning the photo voltaic system The inverter is designed to be connected and used exclusively in conjunction with solar modules Use of the inverter with other DC generators e g wind generators is not...

Страница 17: ...ia temperature controlled fans Air is sucked in from the front and fed via a sealed duct through the AC and DC heat sink before passing directly over the inductors and dissipating The sealed air duct prevents the electronics compartment from coming into contact with the ambient air This approach largely prevents any contamination of the electronics compartment The fan speed and temperature of the ...

Страница 18: ...s can be se cured against switching on with a padlock 2 AC disconnector option The optional AC disconnector breaks the connection from the in verter to the grid 3 Button function For further information about the button function see Button func tions and LED status indicator 4 LED status indicator For further information about the LED status indicator see Button functions and LED status indic ator...

Страница 19: ...PV connections Tauro Eco 50 3 D direct PV connections Tauro Eco 99 3 D 100 3 D dir ect PV connections pre combined Tauro Eco 50 3 P 99 3 P 100 3 P Tauro 50 3 P 19 EN ...

Страница 20: ...y components Above the DC connection area there is space for mounting third party compon ents Components up to a maximum width of 14 5 cm 8 DU can be mounted on the DIN rail The components must have a temperature resistance of 40 C to 85 C Data communica tion area in the inverter The data communication area Pilot PC board is located above the DC connections in the inverter 20 ...

Страница 21: ...tch Switches the terminating resistor for Modbus 0 MB0 on off Position 1 Terminating resistor on factory setting Position 0 Terminating resistor off Modbus 1 MB1 switch Switches the terminating resistor for Modbus 1 MB1 on off Position 1 Terminating resistor on factory setting Position 0 Terminating resistor off Optical sensor To operate the inverter See chapter Button functions and LED status in ...

Страница 22: ...a gram of the IOs On the V GND pin it is possible to feed in a voltage of around 12 5 24 V max 20 with an external power supply The outputs IO 0 5 can then be operated with the extern al voltage A maximum of 1 A can be drawn per output with a maximum of 3 A allowed in total The fuse protection must be located externally CAUTION Risk of polarity reversal at the terminals due to improper connection ...

Страница 23: ...Sensor functions 1x WLAN access point AP is opened Flashing blue 2x WLAN Protected Setup WPS is activated Flashing green 3 seconds max 6 seconds the service notification is ter minated and the key lock is deactivated Lights up yellow LED status indicator The inverter is operating correctly Lights up green The inverter starts Flashing green The inverter is in standby is not operational e g no feed ...

Страница 24: ...n The network connection is being established via WLAN AP 1x WLAN AP search mode active for 30 minutes Flashing blue The network connection is not configured Lights up yellow The inverter is operating correctly a network fault is indicated Lights up red The inverter is performing an update Flashing blue 24 ...

Страница 25: ...Installation and commissioning 25 ...

Страница 26: ...26 ...

Страница 27: ... sides of the inverter and air vents and building openings The following surfaces are permissible for installation Walls corrugated metal walls mounting rails brick walls concrete walls or other non flammable surfaces sufficiently capable of bearing loads Poles installed using mounting rails behind the solar modules directly on the PV mounting system Flat roofs if this is for a film roof make sure...

Страница 28: ...cattle sheep pigs etc Stables or adjoining areas Storage areas for hay straw chaff animal feed fertilizers etc Storage or processing areas for fruit vegetables or viticulture products Areas used in the preparation of grain green fodder or animal feeds The inverter is designed to be dust tight IP 65 However in areas with high dust accumulation the cooling surfaces may collect dust and this may impa...

Страница 29: ...tical wall or column Do not install the inverter horizontally on a vertical wall or pillar Do not install the inverter on a vertical wall or pillar with its connection sockets facing upwards Do not install the inverter overhanging with the connection sockets at the top Do not install the inverter overhanging with the connection sockets at the bottom Do not install the inverter on the ceiling 29 EN...

Страница 30: ...oints only Always hook chains and ropes onto both suspension points Transporting by counterbalanced lift truck or lift truck WARNING Equipment that falls or topples over can cause serious or even fatal injury Secure the inverter to prevent it from falling over when transporting on a counterbal anced lift truck or lift truck Avoid sudden changes in direction braking or acceleration 30 ...

Страница 31: ... fixing materials depending on the subsurface and observe the screw dimension recommendations for the mounting bracket The installer is responsible for selecting the right type of fixing Mounting bracket dimensions Dimensions of the mounting bracket all dimensions in mm 31 EN ...

Страница 32: ...l 1 2 3 Observe the local regulations for lifting heavy loads or use a crane to lift the device attach to crane hoist ing lugs 4 5 To attach the inverter to the mounting bracket use only the screws included in the scope of delivery 32 ...

Страница 33: ... surface different wall plugs and screws are required for floor mounting the floor racks Wall plugs and screws are therefore not included in the scope of supply of the inverter The in staller is responsible for selecting the cor rect wall plugs and screws 2 Mount the inverter and floor racks se curely to a suitable surface using the appropriate installation materials Do not climb onto the device 3...

Страница 34: ... SE solid sector conductor SM stranded sector conductor Fine core cables only in conjunction with ferrules Fine core cables without ferrules may only be connected to the M10 threaded bolts of the grid connections using a suitable M10 cable lug torque 18 Nm Cable gland Multicore version The following cable outer diameters are compatible with the larger bushing 16 27 8 36 2 44 6 53 61 4 mm For the s...

Страница 35: ...over the phases L1 L2 L3 and neutral conductor N The earthing PE does not have to be protected with a protective hose With the AC Daisy Chain option all phases and neutral conductors must be protected with the protective hose Thus two sets of protective hoses are required for the AC Daisy Chain option Grid connections Select sufficiently high cable cross sections depending on the power category an...

Страница 36: ...er current protection Fronius Tauro 50 3 3 50 kVA 3 x 355 A Fronius Tauro Eco 50 3 3 50 kVA 3 x 355 A Fronius Tauro Eco 99 3 3 99 99 kVA 3 x 355 A Fronius Tauro Eco 100 3 3 100 kVA 3 x 355 A Changing the clamping area for V type terminal The clamping range of the V type terminal is 35 150 mm when delivered The clamping range can be changed to 185 240 mm by a simple modification of the V type termi...

Страница 37: ...on Deburr the holes using a suitable tool Remove the drilling residues from the inverter 1 2 Insert the screw connection in the hole and secure to the torque specified by the manufacturer The opening must be sealed in accord ance with the protection class of the invert er Safety WARNING Danger due to grid voltage and DC voltage from solar modules An electric shock can be fatal Ensure that both the...

Страница 38: ...les ensure that all the cables are tightened to the inverter terminals with the specified torque IMPORTANT For PE connection the requirements defined under Safety rules for a safe connection of the PE conductor must also be observed Opening the in verter 1 2 Switching off the AC disconnector option 1 Connecting the inverter to the public grid Singlecore Ensure that the phases are connected in the ...

Страница 39: ...1 2 3 4 5 6 39 EN ...

Страница 40: ...7 Connecting the inverter to the public grid Mul ticore When connecting ensure that the phases are in the correct order PE N L1 L2 and L3 1 2 3 4 40 ...

Страница 41: ... relief device The strain relief device is not part of the scope of supply 6 Secure to the torque specified by the manufacturer 7 8 9 Connecting the inverter to the public grid Daisy Chain Ensure that the phases are connected in the right order PE N L1 L2 and L3 41 EN ...

Страница 42: ...1 2 3 4 5 6 42 ...

Страница 43: ...9 10 Connecting cables with a cable lug Alternatively a cable with a cable lug can be connected to the M12 threaded bolts on the grid connections in order to connect the cables to the V type terminals 43 EN ...

Страница 44: ...1 WARNING Danger from DC voltage Even when the DC disconnectors are switched off the fuse boards 100 3 D 99 3 D fuse board 50 3 D and everything before the DC disconnectors are live An electric shock can be fatal Prior to any connection work disconnect the inverter on the AC side and the DC side CAUTION Risk of damage to the inverter as the result of incorrectly tightened terminals Incorrectly tig...

Страница 45: ...eds the specified values the inverter will be destroyed and all warranty claims will be forfeited The temperature coefficients on the data sheet of the solar modules must be ob served Exact values for sizing the solar modules can be obtained using suitable calculation tools such as the Fronius Solar configurator IMPORTANT Before connecting up the solar modules check that the voltage for the solar ...

Страница 46: ... fused in a combiner box before the inverter pre combined ver sion Example of Froni us Tauro Eco 50 3 P 99 3 P 100 3 P combiner box PV 1 1 PV 1 2 PV 1 n SPD PV 1 breaker DC PV 2 1 PV 2 2 PV 2 n SPD PV 2 breaker DC PV 1 PV 2 Combiner Box GAK F1 1 1 F1 1 2 F1 2 1 F1 2 2 F1 n 1 F1 n 2 F2 1 1 F2 1 2 F2 2 1 F2 2 2 F2 n 1 F2 n 2 Fuses Fuses DC fuse optional depending on national standard DC breaker opti...

Страница 47: ...1 1 F3 1 2 F3 2 1 F3 2 2 F3 n 1 F3 n 2 Fuses Fuses Fuses DC fuse optional depending on national standard DC breaker optional DC SPD optional Distribution of the solar module strings for the direct version Divide the existing solar module strings evenly between the PV inputs PV1 PV2 PV3 of the inverter Start with the odd inputs first and only then fill up the even inputs to divide the power as even...

Страница 48: ...ors as la belled Unused MC4 connectors on the inverter must be covered with the cover plates supplied with the inverter MC4 connector cover To protect the MC4 connectors a cover plate can be mounted on the inverter The cover plate can be ordered as an optional accessory together with the floor racks 48 ...

Страница 49: ...ed in a DC combiner box must according to the applicable national regulations be fused per string in the DC combiner box Before working in the connection area of the inverter the DC voltage must be switched off This can also be done in the DC combiner box 1 2 3 4 5 6 49 EN ...

Страница 50: ...e same rating Do not replace faulty fuses with bolts CAUTION Danger due to incorrectly dimensioned string fuses Incorrectly dimensioned string fuses can cause damage to the inverter for these connec ted components The following string fuses should be used for the D direct version of the Fronius Tauro Max 10 A per string use of 15 A gPV fuse 1000 V possible Fronius item num ber 41 0007 0230 fuse 15...

Страница 51: ...string 1 1 2 7 Fronius Tauro Eco 99 100 3 D string 1 1 2 7 Check values Only replace faulty fuses with new ones of the same rating 1 Replacing fuses Fronius Tauro Eco 99 100 3 D string 3 1 3 8 Check values Only replace faulty fuses with new ones of the same rating 1 2 3 4 51 EN ...

Страница 52: ...5 Closing and switching on the inverter 1 2 3 4 52 ...

Страница 53: ...tion The DC disconnectors may only ever be actuated simultaneously one immediately after the other 30min WLAN Access Point OFF ON 2 2 3x 5 The DC disconnector in the On switch position automatically opens the WLAN access point AP when starting for the first time Alternatively the WLAN access point can be opened with the optical sensor see chapter Button functions and LED status indicator on page 2...

Страница 54: ...ed Fine stran ded with fer rules with collar Fine stran ded with fer rules without collar Cable re commenda tion 100 m 10 mm 0 14 1 5 mm2 0 14 1 5 mm2 0 14 1 mm2 0 14 1 5 mm2 min CAT 5 UTP Modbus connections with push in terminal Distance max Stripping length Solid Fine stran ded Fine stran ded with fer rules with collar Fine stran ded with fer rules without collar Cable re commenda tion 300 m 10 ...

Страница 55: ...he inverter observe the fol lowing points Depending on the number and cross section of the wired data communication cables remove the corresponding blanking plugs from the sealing insert and insert the data communication cables Make sure that you insert the corresponding blanking plugs into any free openings on the sealing insert Note Should the blanking plugs be missing or improperly fitted then ...

Страница 56: ...t sideways 3 Guide the data cables first through the strain relief device cap nut and then through the housing opening 4 Insert the sealing ring between the cap nut and the housing opening Press the data cables into the seal s cable guide Then press in the seal until it reaches the under side of the strain relief device 56 ...

Страница 57: ...The bypass must be removed when installing a trigger device or a WSD chain The WSD switch of the first inverter with connected trigger device in the WSD chain must be in position 1 primary device The WSD switch of all other inverters should be in the 0 secondary device position Max distance between two devices 100 m Max number of devices 28 IN IN OUT OUT IN IN OUT OUT IN IN OUT OUT CAT Potentialfr...

Страница 58: ...untry setup can only be set when using the inverter for the first time If the country setup needs to be changed at a later date please contact your installer Technical Sup port team Fronius system monitoring Pilot display To simplify the display the vertical installa tion position of the Pilot pc board LED dis play is shown horizontally below Installation with the app The Fronius Solar start app i...

Страница 59: ...e installation wizard is opened 5 Follow the installation wizard in the individual sections and complete the installation 6 Add system components in Solar web and start up the PV system The network wizard and the product setup can be carried out independently of each oth er A network connection is required for the Solar web installation wizard Ethernet 1 Establish a connection to the inverter LAN1...

Страница 60: ...he inverter Switch off power to the inverter 1 1 Turn off the automatic circuit breaker 2 Turn the DC disconnector to the Off switch position To start up the inverter again follow the steps listed above in reverse order 60 ...

Страница 61: ...Settings website of the inverter 61 ...

Страница 62: ...62 ...

Страница 63: ...and password or go to the User menu and click on the User login button and then log in with your user name and password IMPORTANT Depending on the user s authorization settings can be executed in the individual menus Selecting the lan guage 1 In the User menu click on the Language button and select the desired language 63 EN ...

Страница 64: ...Meters can be installed in the system A different address needs to be set for each Smart Meter The Watt value on the generator meter is the sum of all generator meters The Watt value on the consumption meter is the value of all consumption meters Ohmpilot All Ohmpilots available in the system are displayed Select the desired Ohmpilot and add it to the system via Add Functions and IOs Load manageme...

Страница 65: ...e apparent power consumption and apparent power output can be entered here for the Australia country setup Demand Re sponse Modes DRM Here you can enter a value for the apparent power input and the apparent power output for the Australia country setup 65 EN ...

Страница 66: ...he factory settings All settings All configuration data is reset with the exception of the country setup Changes to the country setup may only be carried out by authorized personnel All settings with no network All configuration data is reset with the exception of the country setup and the network settings Changes to the country setup may only be carried out by authorized personnel Event Log Curre...

Страница 67: ...icence file the following error occurs The licence has already been installed and the wizard can be closed 1 Complete the installation work see chapter Using for the first time on page 58 2 Connect to the website of the inverter 3 Enter the serial number and verification code VCode of the defective and replace ment unit The serial number and the VCode can be found on the rating plate of the invert...

Страница 68: ...s Enable remote maintenance 1 Click on the Enable remote maintenance button Remote maintenance access for the Fronius Support team is enabled IMPORTANT Remote maintenance access gives Fronius Technical Support exclusive access to the in verter via a secure connection Diagnostic data is transmitted here that can be used for troubleshooting purposes Only enable remote maintenance access following a ...

Страница 69: ...ress subnet mask DNS and gateway 4 Click on the Connect button The connection is established WLAN Establishing a connection via WPS 1 Click the Enable button 2 Activate WPS on the WLAN router see documentation provided with the WLAN router The connection is established automatically Select and connect WLAN network The networks found are shown in the list Clicking on the refresh button will carry o...

Страница 70: ...iving end Parity The parity bit can be used to check the parity It detects transmission errors A parity bit can safeguard a specific number of bits The value 0 or 1 of the parity bit must be cal culated by the sender and is checked by the recipient using the same calculation The parity bit can be calculated for even and odd parity SunSpec Model Type Depending on the SunSpec model there are two dif...

Страница 71: ...n enabled IOT devices on the local network can access inverter information without authentication For security reasons the interface is deactivated at the factory and should not be activated if it is not required for a third party application e g EV charger smart home solutions etc For monitoring Fronius recommends using Fronius Solar web instead which provides secure access to inverter status and...

Страница 72: ...n feed in at any time without re striction If the power reduction of an inverter to 0 is not sufficient solution b must be applied Solution b Integration of a plant controller This solution is used if the specifications of the grid operator cannot be met by limiting a single inverter or if permanent access e g remote shutdown is required In this case the integration of a PLANT CONTROLLER is recomm...

Страница 73: ...eiver and the I Os terminal of the inverter can be connected to one another in accordance with the connection diagram If the distance between the inverter and the ripple control signal receiver exceeds 10 m at least a CAT 5 cable is recommended and the shield must be connected at one end to the push in terminal of the data communication area SHIELD 1 Ripple control signal receiver with 4 relays fo...

Страница 74: ...DNO Feedback Active Power 1 cap Power Factor cos φ Rule 3 0 2 4 6 8 10 1 3 5 7 9 11 30 DNO Feedback Active Power 1 cap Power Factor cos φ Rule 4 0 2 4 6 8 10 1 3 5 7 9 11 0 DNO Feedback Active Power 1 cap Power Factor cos φ EXPORT IMPORT 0 0 2 3 4 5 6 7 8 9 10 11 1 2 4 1 3 5 6 9 11 7 10 8 v v GND GND I O Power Management None None None None None None None None IO control IO control IO control IO c...

Страница 75: ... recommended and the shield must be connected at one end to the push in terminal of the data communication area SHIELD 1 Ripple control signal receiver with 3 relays for effective power limiting 2 I Os of the data communication area Use the preconfigured file for 3 relay mode 1 Download the file fpc under 3 relay mode onto the end device 2 Upload the file fpc in the I O Power Management menu using...

Страница 76: ...60 DNO Feedback Active Power 1 cap Power Factor cos φ Rule 3 0 2 4 6 8 10 1 3 5 7 9 11 30 DNO Feedback Active Power 1 cap Power Factor cos φ Rule 4 0 2 4 6 8 10 1 3 5 7 9 11 0 DNO Feedback Active Power 1 cap Power Factor cos φ EXPORT IMPORT 0 0 2 3 4 5 6 7 8 9 10 11 1 2 4 1 3 5 6 9 11 7 10 8 v v GND GND I O Power Management None None None None None None None None IO control IO control IO control N...

Страница 77: ...recommended and the shield must be connected at one end to the push in terminal of the data communication area SHIELD 1 Ripple control signal receiver with 2 relays for effective power limitation 2 I Os of the data communication area Use the preconfigured file for 2 relay mode 1 Download the file fpc under 2 relay mode onto the end device 2 Upload the file fpc in the I O Power Management menu usin...

Страница 78: ...11 60 DNO Feedback Active Power 1 cap Power Factor cos φ Rule 3 0 2 4 6 8 10 1 3 5 7 9 11 30 DNO Feedback Active Power 1 cap Power Factor cos φ Rule 4 0 2 4 6 8 10 1 3 5 7 9 11 0 DNO Feedback Active Power 1 cap Power Factor cos φ EXPORT IMPORT 0 0 2 3 4 5 6 7 8 9 10 11 1 2 4 1 3 5 6 9 11 7 10 8 v v GND GND I O Power Management None None None None None None None None IO control IO control None None...

Страница 79: ... recommended and the shield must be connected at one end to the push in terminal of the data communication area SHIELD 1 Ripple control signal receiver with 1 relay for effective power limiting 2 I Os of the data communication area Use the preconfigured file for 1 relay mode 1 Download the file fpc under 1 relay mode onto the end device 2 Upload the file fpc in the I O Power Management menu using ...

Страница 80: ... 11 100 DNO Feedback Active Power 1 cap Power Factor cos φ Rule 2 0 2 4 6 8 10 1 3 5 7 9 11 0 DNO Feedback Active Power 1 cap Power Factor cos φ EXPORT IMPORT 0 0 2 3 4 5 6 7 8 9 10 11 1 2 4 1 3 5 6 9 11 7 10 8 v v GND GND I O Power Management None None None None None None None None IO control None None None 80 ...

Страница 81: ...Appendix 81 ...

Страница 82: ...82 ...

Страница 83: ...e SPD surge protective device is triggered the inverter must be repaired by an authorised specialist Install the bypass ex works or a trigger device Set the WSD wired shutdown switch to position 1 WSD primary device WARNING Danger due to work that has been carried out incorrectly This can result in serious injury and damage to property Installing and connecting a surge protective device SPD must o...

Страница 84: ...ent to the array 3 D version PV1 PV2 PV3 P version PV1 PV2 PV3 72 72 125 A4 0 0 0 A4 Max capacity of the PV generator against earth 10000 nF Output data Grid voltage range 180 270 VAC Rated grid voltage 220 VAC 230 VAC 1 Rated power 50 kW Rated apparent power 50 kVA Rated frequency 50 60 Hz 1 Power factor cos phi 0 1 ind cap 2 Grid connection 3 NPE 380 220 VAC 3 NPE 400 230 VAC Maximum output powe...

Страница 85: ...ciple Controlled forced air ventila tion RCMU Integrated DC isolation measurement Integrated 2 Overload performance Operating point shift power limitation WLAN Frequency range 2412 2462 MHz Channels power used Channel 1 11 b g n HT20 Channel 3 9 HT40 18 dBm Modulation 802 11b DSSS 1Mbps DBPSK 2Mbps DQPSK 5 5 11Mbps CCK 802 11g OFDM 6 9Mbps BPSK 12 18Mbps QPSK 24 36Mbps 16 QAM 48 54Mbps 64 QAM 802 ...

Страница 86: ...0 1 ind cap 2 Grid connection 3 NPE 380 220 VAC 3 NPE 400 230 VAC Maximum output power 50 kW Rated power 50 kW Nominal output current phase 75 8 A 72 5 A Total harmonic distortion 3 AC overvoltage category 3 Current inrush 5 209 A peak 30 5 A rms over 2 1 ms4 Maximum output fault current duration 37 2 A 19 4 ms General data Night time power loss standby consumption 15 W European efficiency 580 800...

Страница 87: ...99 3 P Input data Maximum input voltage at 1000 W m 10 C in an open circuit 1000 VDC Start up input voltage 650 VDC MPP voltage range 580 930 VDC Number MPP controller 1 Maximum input current IDC max Total P version PV1 PV2 D version PV1 PV2 PV3 per string for D version only 175 A 100 A 100 A 75 A 75 A 75 A 14 5 A Max short circuit current ISC PV ISC max P version total D version total PV1 PV2 PV3...

Страница 88: ...s4 Maximum output fault current duration 93 9 A 22 ms General data Night time power loss standby consumption 15 W European efficiency 580 800 930 VDC 98 2 97 7 97 3 Maximum efficiency 98 5 Safety class 1 EMC emission class B Pollution degree 3 Permitted ambient temperature with built in AC disconnector option 40 C 65 C 30 C 65 C Permitted storage temperature 40 C 70 C Relative humidity 0 100 Sound...

Страница 89: ...mum input current IDC max Total P version PV1 PV2 D version PV1 PV2 PV3 per string for D version only 175 A 100 A 100 A 75 A 75 A 75 A 14 5 A Max short circuit current ISC PV ISC max P version total D version total PV1 PV2 PV3 for D version only per string for D version only 250 A 355 A 125 A 125 A 125 A 20 A Maximum PV field power PPV max Total P version PV1 PV2 D version PV1 PV2 PV3 150 kWp 79 k...

Страница 90: ...iency 98 5 Safety class 1 EMC emission class B Pollution degree 3 Permitted ambient temperature with built in AC disconnector option 40 C 65 C 30 C 65 C Permitted storage temperature 40 C 70 C Relative humidity 0 100 Sound pressure level 580 VDC 930 VDC 74 4 79 3 dB A ref 20 µPA Protection class IP65 Dimensions height x width x depth 755 x 1109 x 346 mm Weight 109 kg Protection devices DC disconne...

Страница 91: ...by the electrical configuration of the inverter 5 Current peak when switching on the inverter Integrated DC disconnector Settings Product name EATON PV DIS 10 125 2 REFOHA Rated insulation voltage 1000 VDC Rated impulse with stand voltage 6 kV Suitability for insula tion Yes DC only Rated operating cur rent Rated operating current Ie 100 A DC PV2 utilisation cat egory as per IEC EN 60947 3 Rated o...

Страница 92: ... Ue V d c Rated op erating current Ie A DC PV1 I make I break 1 5x Ie A DC PV1 Rated op erating current Ie A DC PV2 I make I break 4x Ie A DC PV2 500 125 187 5 125 500 600 125 187 5 125 500 800 125 187 5 125 500 900 125 187 5 110 440 1000 125 187 5 100 400 92 ...

Страница 93: ...equency ranges and maximum HF transmis sion power used by Fronius wireless products available for sale in the EU in accordance with Article 10 8 a and 10 8 b of the RED Fronius products must be installed and operated such that the product is always 20 cm or more away from the body Power failure The standard measurement and safety procedures integrated into the inverter ensure that in the event of ...

Страница 94: ...t your installer or PV system contact person Fronius manufac turer s warranty Detailed country specific warranty terms are available on the internet www fronius com solar warranty To obtain the full warranty period for your newly installed Fronius inverter or storage sys tem please register at www solarweb com Disposal If your inverter is to be replaced Fronius will take back the old device and ar...

Страница 95: ...95 EN ...

Страница 96: ... ...

Отзывы: