Connecting the inverter to the public grid (AC side)
Safety
WARNING!
Danger due to incorrect operation and incorrectly performed work.
This can result in serious injury and damage to property.
▶
Read the Installation and Operating Instructions before installing and commissioning
the equipment.
▶
Only qualified personnel are authorised to commission your inverter and only within
the scope of the respective technical regulations.
WARNING!
Danger due to grid voltage and DC voltage from solar modules that are exposed to
light.
An electric shock can be fatal.
▶
Prior to any connection work, disconnect the inverter on the AC side and the DC
side.
▶
Only an authorised electrical engineer is permitted to connect this equipment to the
public grid.
WARNING!
Danger due to damaged and/or contaminated terminals.
This can result in serious injury and damage to property.
▶
Before making any connections, check the terminals for damage and contamination.
▶
Remove contamination in the de-energized state.
▶
Have defective terminals repaired by an authorised specialist.
Connecting the
inverter to the
public grid (AC
side)
NOTE!
The neutral conductor must be connected in order to operate the inverter.
It is not possible to operate the inverter in unearthed grids, such as IT grids (insulated
grids without ground conductor).
▶
Make sure that the grid's neutral conductor is grounded.
IMPORTANT!
The ground conductor of the AC cable must be laid in such a way that it is the last to be
disconnected in the event that the strain-relief device should fail.
This can be ensured by making it somewhat longer and by laying it in a loop.
1
Turn off the automatic circuit breaker.
48
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......