Prerequisites for connecting the inverter
Permitted cables
Cables with the following design can be connected to the terminals of the inverter:
-
Copper: round, solid
-
Copper: round, fine-stranded, up to conductor class 4
Grid connections with push-in terminal
Select a sufficiently large cable cross section based on the actual device output.
Number of pins
Solid
Multi-stranded
Fine-stranded
Fine-stranded with ferrules
‐
with/without collar
5
1.5 - 10 mm
2
1.5 - 10 mm
2
1.5 - 10 mm
2
1.5 - 6 mm
2
Grid connections backup power with push-in terminal
Select a sufficiently large cable cross section based on the actual device output.
Number of pins
Solid
Multi-stranded
Fine-stranded
Fine-stranded with ferrules
‐
with/without collar
3
1.5 - 10 mm
2
1.5 - 10 mm
2
1.5 - 10 mm
2
1.5 - 6 mm
2
PV/BAT connections with push-in terminal
Select a sufficiently large cable cross section based on the actual device output.
Number of pins
Solid
Multi-stranded
Fine-stranded
Fine-stranded with ferrules
‐
with/without collar
2 x 4
4 - 10 mm
2
4 - 10 mm
2
4 - 10 mm
2
4 - 6 mm
2
Ground electrode terminal
Select a sufficiently large cable cross section based on the actual device output.
Number of pins
Solid
Multi-stranded
Fine-stranded
Fine-stranded with ferrules
‐
with/without collar
2
1.5 - 16 mm
2
1.5 - 16 mm
2
1.5 - 16 mm
2
1.5 - 16 mm
2
4
1.5 - 10 mm
2
1.5 - 10 mm
2
1.5 - 10 mm
2
1.5 - 10 mm
2
*
According to product standard IEC 62109, the ground conductor must corres-
pond to the phase cross-section for phase cross-sections ≤16 mm²; for phase
cross-sections >16 mm², it must correspond to at least 16 mm².
**
The cable cross section must be dimensioned in accordance with the installation
situation and the specifications of the battery manufacturer.
Permitted cables
for the data com-
munication area
Cables with the following design can be connected to the terminals of the inverter:
45
EN
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......