Protection of people and equipment
WSD (wired shut-
down)
The wired shutdown (WSD) interrupts the inverter's grid power feed if the trigger device
(switch) has been activated.
If an inverter (slave) fails, it is bypassed and the other inverters continue operating. If a
second inverter (slave) or the inverter (master) fails, the operation of the entire WSD
chain is interrupted.
For installation, see
Installing the WSD (wired shutdown)
RCMU
The inverter is equipped with a universal current-sensitive residual current monitoring
unit (RCMU = Residual Current Monitoring Unit) in accordance with IEC 62109-2.
This device monitors residual currents from the PV module to the grid connection of the
inverter and disconnects the inverter from the grid in the event of unauthorised residual
current.
22
Содержание Symo GEN24 10.0
Страница 2: ......
Страница 10: ...10 ...
Страница 11: ...General information 11 ...
Страница 12: ...12 ...
Страница 28: ...28 ...
Страница 29: ...Backup power variant PV Point OP 29 ...
Страница 30: ...30 ...
Страница 32: ...32 ...
Страница 33: ...Backup power variant Full Backup 33 ...
Страница 34: ...34 ...
Страница 41: ...Installation 41 ...
Страница 42: ...42 ...
Страница 82: ...82 ...
Страница 83: ...Settings web interface of the inverter 83 ...
Страница 84: ...84 ...
Страница 104: ...104 ...
Страница 105: ...Appendix 105 ...
Страница 106: ...106 ...
Страница 116: ...116 ...
Страница 117: ...Circuit diagrams 117 ...