
Mains power
on/off equipment
Evidence of proper operation must be provided by measurement or visual inspection.
AC and DC disconnection inspection (performed under no load)
-
AC disconnection ® battery charging system must switch off
-
DC disconnection ® battery charging system must stop charging
-
Switch on AC and DC
The correct operation of the indicators and controls must be checked.
Indicators and
control elements
-
Check display for correct function
-
Check that controls work in line with the operating instructions
57
EN
Содержание Selectiva 2040
Страница 2: ......
Страница 5: ...General information 5 ...
Страница 6: ...6 ...
Страница 12: ...12 ...
Страница 13: ...Replacing components 13 ...
Страница 14: ...14 ...
Страница 21: ...1 Fit the front panel of the housing see chapter Closing the device 21 EN ...
Страница 27: ...1 2 2 1 Fit the DC connection plate and secure with two 4x20 TX20 screws Tightening torque 1 5 Nm 27 EN ...
Страница 32: ...1 1 Fit the M4x10 TX20 screw on the device frame AC side Tightening torque 2 5 Nm 32 ...
Страница 34: ...1 Fit the housing cover see chapter Closing the 2 kW device 34 ...
Страница 42: ...42 ...
Страница 43: ...Safety Inspections 43 ...
Страница 44: ...44 ...
Страница 59: ...59 EN ...