![Fronius Pull Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/fronius/pull/pull_operating-instructions-manual_2339402055.webp)
Robot welding torch
Safety
CAUTION!
Risk of burns from hot torch body, hot torch body coupling and other hot weld-
ing torch components.
Before starting work on the torch body, the torch body coupling and all other
welding torch components:
▶
Allow the torch body, torch body coupling and all other welding torch com-
ponents to cool down to room temperature (+25 °C, +77 °F)
▶
Wear electrically insulated and heat protective gloves
▶
Use a suitable tool
General
The following torch bodies are recommended for the CMT process:
-
MTB 250i / 320i / 400i / 500i / 700i: 22–36°
-
MTB 330i: 22°
The following maximum angles are permitted during the CMT process:
-
MTB 250i / 320i / 400i / 500i / 700i: 45°
-
MTB 330i: 36°
Standard OVT TXi TXM OPT CAM*
*Optional (no torch body)
The robot welding torch transmits the arc power to the workpiece. The gas-
cooled or water-cooled TPS /i welding torch is designed for use with the Crash-
Box /i.
The torch body has an integrated lead for gas nozzle touch sensing.
Standard:
With wearing parts, without contact tip
OVT:
Without wearing parts
TXi:
Automatic torch body changeover
TXM:
Manual torch body changeover
55
EN
Содержание Pull
Страница 2: ......
Страница 21: ...System configurations 21...
Страница 22: ...22...
Страница 41: ...System components 41...
Страница 42: ...42...
Страница 48: ...Do not dispose of used devices with domestic waste Dispose of them according to the safety rules 48...
Страница 56: ...OPT CAM Prepared for the camera recording option 56...
Страница 67: ...Controls connections and mechan ical components 67...
Страница 68: ...68...
Страница 85: ...Assembling system components conventional robot 85...
Страница 86: ...86...
Страница 91: ...3 3 Nm 2 43 lb ft 2 6 Nm 4 43 lb ft 3 91 EN...
Страница 95: ...Optimum hosep ack arrangement R R R 200 mm R 200 mm 95 EN...
Страница 102: ...102...
Страница 103: ...Assembling system components PAP robot 103...
Страница 104: ...104...
Страница 107: ...Fitting the SplitBox SB 500i R PAP Fitting the SB 500i R PAP 1 2 107 EN...
Страница 110: ...4 Nm 2 95 lb ft 2 8 Nm 5 90 lb ft 3 110...
Страница 112: ...11 Nm 8 11 lb ft 5 Fitting the WF Robacta Drive to the robot PAP 1 1 2 112...
Страница 113: ...3 42 0411 1315 BY2 0201 4896 4 18 Nm 13 28 lb ft 5 113 EN...
Страница 114: ...6 114...
Страница 117: ...3 4 117 EN...
Страница 118: ...118...
Страница 119: ...Assembling further system com ponents 119...
Страница 120: ...120...
Страница 128: ...2 128...
Страница 131: ...Steel inner liner 1 2 3 131 EN...
Страница 134: ...Fitting the OPT i camera mount 1 2 3 4 134...
Страница 137: ...5 6 Fitting the inner liner unreeling wirefeeder wire buffer 1 2 137 EN...
Страница 138: ...3 4 5 Fitting the inner liner SplitBox WF 25i with in ternal inner liner 1 138...
Страница 139: ...2 3 4 Fitting the inner liner wire buffer WF Robacta Drive with in ternal wirefeed ing hose 1 2 139 EN...
Страница 140: ...3 4 Fitting the inner liner wire buffer WF Robacta Drive with ex ternal wirefeed ing hose 1 2 3 140...
Страница 143: ...Start up 143...
Страница 144: ...144...
Страница 148: ...5 6 7 8 Torx 40 1 Nm 0 74 lb ft 9 10 148...
Страница 150: ...5 12 mm 42 0411 0160 6 7 8 12 mm 5 Nm 3 69 lb ft 42 0411 0160 2 9 10 150...
Страница 151: ...2 1 11 12 151 EN...
Страница 156: ...156...
Страница 157: ...Troubleshooting maintenance and disposal 157...
Страница 158: ...158...
Страница 168: ...3 4 Inserting the inner liner 1 2 3 4 168...
Страница 172: ...Fitting wearing parts to the torch body 1 2 3 Fitting wearing parts to the torch body MTW 700 i 1 2 172...
Страница 173: ...Removing the CrashBox PAP from the robot 1 BY2 0201 4896 2 3 4 5 1 6 173 EN...
Страница 174: ...1 1 7 8 9 10 Disposal Dispose of in accordance with the applicable national and local regulations 174...
Страница 175: ...Technical data 175...
Страница 176: ...176...
Страница 181: ...Triggering torques and weight distance diagram 181 EN...
Страница 188: ...The product conforms to the requirements of the IEC 60974 7 standard ED Duty cycle 188...
Страница 195: ...195 EN...