![Fronius Primo GEN24 3.0 Скачать руководство пользователя страница 97](http://html1.mh-extra.com/html/fronius/primo-gen24-3-0/primo-gen24-3-0_operating-instructions-manual_2339204097.webp)
LED status indicator
The inverter indicates a critical status and there is no
grid power feed process.
Lights up red
The inverter indicates a back-up power overload.
Flashing red
The network connection is being established via WPS.
2x = WPS search mode.
Flashing green
The network connection is being established via
WLAN AP.
1x = WLAN AP search mode (active for 30 minutes).
Flashing blue
The network connection is not configured.
Lights up yellow
The inverter is operating correctly, a network fault is in-
dicated.
Lights up red
The inverter is performing an update.
/
Flashing blue
Installation with
the app
The "Fronius Solar.start" app is needed for this installation method. Depending
on the end device with which the installation will be carried out, download the
app for the respective platform.
1
2
open access point
Setup your PV system in a few minutes.
START INSTALLATION
LOGIN
Log in with your Fronius credentials (email adress
& password) in order to get the most out of the
PV System. Installing a new product does not
require a Login.
Imprint & Contact
Terms & Conditions
Data Privacy
Fronius Solar.start
1
Start the installation in the app.
2
Select the product to which the connection should be established.
97
EN
Содержание Primo GEN24 3.0
Страница 2: ......
Страница 7: ...Dimensions of the inverter 187 Fronius Primo GEN24 3 6 kW 189 Fronius Primo GEN24 3 6 kW 189 7 EN...
Страница 12: ...12...
Страница 13: ...General information 13...
Страница 14: ...14...
Страница 18: ...Fronius recommends testing the Internet connection on site according to the minimum requirements 18...
Страница 34: ...34...
Страница 35: ...Backup power variant PV Point OP 35...
Страница 36: ...36...
Страница 38: ...38...
Страница 39: ...Backup power variant Full Backup 39...
Страница 40: ...40...
Страница 48: ...48...
Страница 49: ...Installation 49...
Страница 50: ...50...
Страница 57: ...Do not install the inverter on the ceiling 57 EN...
Страница 101: ...Settings user interface of the in verter 101...
Страница 102: ...102...
Страница 132: ...132...
Страница 133: ...Options 133...
Страница 134: ...134...
Страница 143: ...2 Set the DC disconnector to the On switch position Switch on the auto matic circuit breaker 143 EN...
Страница 144: ...144...
Страница 145: ...Appendix 145...
Страница 146: ...146...
Страница 172: ...172...
Страница 173: ...Circuit diagrams 173...
Страница 174: ...174...
Страница 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Страница 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Страница 177: ...Fronius Primo GEN24 with two BYD Battery Box Premium HV connected in parallel Circuit Diagram 177 EN...
Страница 178: ...Fronius Primo GEN24 with three BYD Battery Box Premium HV connected in parallel Circuit Diagram 178...
Страница 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Страница 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Страница 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Страница 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Страница 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Страница 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Страница 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Страница 187: ...Dimensions of the inverter 187...
Страница 188: ...188...
Страница 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Страница 190: ...190...
Страница 191: ...191 EN...
Страница 192: ......