Bring the PowerLiner into position at
the interface to the Robacta Drive Ea
-
syTwin using a Velcro® fastener
Connecting the
hosepack
Connect the lead hosepack (the gas purging line and the gas line are only contained
in the leading hosepack) to the lead power source (where the control box is mounted)
Connect the trail power cable (control line is only contained in the trail hosepack) to
the trail power source
Connect the coolant lines to the cooling unit
Connect the gas purging line to the control box
Connect the gas line to the control box
Connect the control line to the control box
Connect the LocalNet line to the control box and trail power source
Connect the compressed air line to the control box
Connect the gas feed to the control box (min. 30 l/min)
Installing the
wirefeeding hose
in the Robacta
Drive EasyTwin
The wirefeeding hose must only be fitted when using the device for the first time.
1
2
3
1
2
3
4
5
6
7
8
9
1
2
Содержание Drive EasyTwin
Страница 2: ...2...
Страница 4: ...4...
Страница 8: ...8 Installing the CrashBox Drive EasyTwin on the robot 1 2 3 4 5 6 1 2 3 4 5 6...
Страница 12: ...12 3 Fully open 4 5 6 7 3 4 5 6 7...
Страница 13: ...13 EN 1 2 3 4 5 Set the contact pressure 3 rings must be visible 7 8 9 10 11...
Страница 14: ...14 6 7 12 13...
Страница 38: ...38 Replacing wearing parts Preparation replacing the feed rollers and nozzle 1 2 3 Fully open 4 5 6 1 2 3 4 5 6...
Страница 39: ...39 EN 7 8 9 10 11 12 7 8 9 10 11 12...
Страница 41: ...41 EN 5 6 Now the welding wire must be threaded see Threading the welding wire from Figure 5 on page 12 5 6...
Страница 42: ...42...
Страница 43: ...43 EN...