Start-up
Prerequisites for
start-up
The following prerequisites must be fulfilled for the start-up:
-
Torch body changeover station bolted to the underlying surface
-
Torch body changeover station installed
-
All torch body sensors checked, wire sensor set
-
All torch bodies have been prepared
-
When using a Robacta hosepack: system components for Robacta hosepack pre-
pared
-
When using a Robacta Drive or Robacta Drive CMT hosepack: torch body coupling
has been prepared
-
Power source has been prepared
-
Torch body coupling mounted onto robot
-
Torch bodies aligned for special rack positions (only if necessary)
-
Compressed-air booster unit connected and adjusted
-
Torch body changed manually
-
Robot set up using robot programming aid
Start-up
The torch body changeover station is started up by an active signal from the robot control.
Содержание 4,044,008
Страница 2: ...2...
Страница 4: ...4...
Страница 15: ...General information...
Страница 16: ......
Страница 24: ...24...
Страница 25: ...Controls connections and mechani cal components...
Страница 26: ......
Страница 35: ...Installation and commissioning...
Страница 36: ......
Страница 65: ...65 EN 3 3...
Страница 84: ...84...
Страница 85: ...Troubleshooting...
Страница 86: ......
Страница 90: ...90...
Страница 91: ...Care maintenance and disposal...
Страница 92: ......
Страница 125: ...125 EN Disposal Disposal Dispose of in accordance with the applicable national and local regulations...
Страница 126: ...126...
Страница 127: ...Technical data...
Страница 128: ......
Страница 130: ...130...
Страница 131: ...Appendix...
Страница 132: ...132 Pneumatic diagram V23072012...
Страница 134: ...134...
Страница 135: ...135...