background image

Содержание FAR105S1A11

Страница 1: ... llOx tla pan head Phil ps SCreWS 3 G Top channel H SMe curtains 2 I Foam seal IMPORTANT Observeall governingcodesand ordinances Checkthe locationwhereair condiUoner will be installed Proper installation is your responsibility Make sure you ha_eeverything necessaryfor correct installation Thelocationshouldprovide Groundedelec_ icaloutle within 4 It 122 cm ol wherethe powercord exitsthe airconditio...

Страница 2: ...um B 16114 41 3 cm minimum Height 16 40 6 cm plus twice thickness of wood used to build frame Depth 21tz 6 4 cm minimum to 6 15 2cm maximum C A _6 4o ecm B 22sis 57 5 cm C Wood thickness D 2 h 6 4 minimum to 6 15 2cm maximum 2 ...

Страница 3: ...ndlethe aircondidonergently 1 Remove the aircondil_onerlromthe carton andplace iron cardboard 2 Removeshippingscrews fromboth sidesof the cabinet A WYndowlock breckez screw B Mflndow lock breckez 5 Remove the ground screw and ground wire from the front ol the air condiUoner base Save the ground screw 3 x A A Shipping screw Remove front panel by removln 9 2 phillips screws one from etther stde of f...

Страница 4: ...and curtain outward so you may insert the first screw through the middle hole of the curtain Using 10 x _A pan head Phillips screw screw the curtain to the middle hole in the air conditioner cabinet NOTE Thisscrew is requiredto correctlyattach the curtain topto bottom to the air conditioner cabinet _ _ A A Top channel B lO x _ pan head Phillips thread cutting screws Attach Side Curtains 1 LocaLe p...

Страница 5: ... A Window sash B Empty cabinet C Window channel 4 5 Use a 3 lS drillbitto drill3 starterholes_ deepthrough the 3 holesin the cabinetand intothe windowsill Attachcabinet to windowsillwith3 10 x 1 2 pan head Phillipsscrews Attach Side Curtains to Window Frame 1 Pull the left handcurtainout untilitfits intothe window channel Use a s z drillbitto drilla starterholethrough the hole inthe curtainhousing...

Страница 6: ...o not block the louvers on the outside of the air conditioner ILls the customer s responsibility and obligation to have this product installed by a qualified technician familiar with through the wall room air conditioner installations S OpUon 2_PlasWmd wall with no molding If the plastered wall is to be flush with the cabinetand no molding is used the wood frame must be set 1 _ 13 ram into the ins...

Страница 7: ...elsideto side A Level Check that air conditJoner cabinet is tilted to the outside so that water will run to the outside The cabinet should slope at least half a bubble towards the rear Reusethe insulation to sealopeningbetweencabinetand hame Use existingholesinsidesand top of cabinetand 7 10 x 1 wood screws notprovided to attachcabinetto frame NOTE Do notovertJghton screwsorthe cabinet willdistort...

Страница 8: ...reen ground wire B Ground screw 4 Installcontrolpanel backto thefront panelandpushfront panel straight on and then lower it slightly to lock it into place 5 Insertfronttabs of frontpanel intotop of cabinetand swing frontinto place 6 AttachbottomIrontof panelwithfrontpanelscrews Replace controlknobs onsome models NOTE For through the wall installations it needed install moldingaroundthe roomsideof ...

Отзывы: