
610.020-IOM (NOV 19)
Page 12
EVAPORATOR AND AIR COOLER
INSTALLATION - OPERATION - MAINTENANCE
RIGGING
AGHN/GHN/GGHN/MHF (<071 Ø)
Step 1
When shipped, units are stacked, but individually skidded.
Step 2
Separate the top unit from the lower unit.
Step 3
Remove all crating from the top and sides of the skid.
Leave the unit on the skid.
Step 4
Secure hangers to the ceiling. Remove all shipping legs
and the skid from the unit.