background image

1

1

Operating Instructions Scraper Tool

FWSG 710 L

Technical Equipment

Содержание FWSG 710 L

Страница 1: ...1 1 Operating Instructions Scraper Tool FWSG 710 L Technical Equipment...

Страница 2: ...e pipe surface along the entire length of the coupler or half of it Scraping the entire length of the coupler is required when a slide over coupler is employed Only half the coupler up to where insert...

Страница 3: ...oyment of slide over couplers I Preparation Remove obvious dirt particles from the pipe surface to be scraped using for example a clean grease free piece of cloth Determine length of area to be scrape...

Страница 4: ...e housing roughly to relevant dimension marking Picture 2 The blade housing will end up on the left of the marking The position of the blade hous ing will be fine tuned by turning the roller handle un...

Страница 5: ...ing carriage upwards until it is in contact with the pipe wall Picture 3 The supporting arm of the clamping carriage should be roughly parallel to the pipe wall Tighten twist grip knob Picture 6 until...

Страница 6: ...g result If marking has not been completely removed the scraping process has to be repeated from Point III Apply a chamfer about 0 08 0 11 at the end of the pipe using a hand held scraper Clean the pi...

Страница 7: ...e equipment or parts which wear out prematurely due to their environment sand soil etc The tool must be protected from dirt Operational safety The scraper tool FWSG 710 L is based on quality managemen...

Страница 8: ...FRIATEC PE ELECTROFUSION SYSTEMS Technical Plastics Division 426 Fairforest Way Greenville SC 29607 Tel 864 286 8800 Fax 864 234 2060 www friatecusa com E Mail thoeng ipexinc com 2062 1 USA Stand 17 0...

Отзывы: