![Fresh-Aire UV APCO RT Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/fresh-aire-uv/apco-rt/apco-rt_manual_2331803001.webp)
APCO RT is installed in the ductwork of the central
air system to reduce odors and airborne biological
contaminants for improved indoor air quality. APCO RT
also reduces microbial growth within the air system.
IMPORTANT!
• Only qualified technicians should install this product
• Install in accordance with relevant building codes
• Read instructions carefully including safety warnings
Important:
some materials inside the air system (including filter media,
flex duct, wiring etc.) may not be UV light resistant. Use the optional UV
shield (part #TUV-SHIELD-LP) or cover the materials with reflective tape.
WARNING
PROTECT EYES FROM UV LIGHT
TURN OFF UNIT OR DISCONNECT
BEFORE SERVICING
G
3
Cut Hole In Duct Using Template
Cut hole in duct using a cutting tool
appropriate for the duct material.
Use scissors to cut out center of
paper template (pick circular or
linear). Trace cut-line onto duct
using template.
Air Handler
2nd UV Lamp
2
Installation Notes
APCO RT is usually installed on the supply side
duct just above the air system but can also be
installed on the return side if necessary.
The APCO RT unit should be oriented so that
the air flows past the
UV Light
first then into
the
Matrix Element.
If a second optional UV lamp is used (APCO
RT Dual) select a location inside the air system
that will allow it to shine on the greatest
surface area or the area with the most evident
microbial growth. To install the secondary UV
light use the
Optional 2nd Remote UV Light
Installation Instructions
provided with APCO
RT Dual.
Typical installations include:
A
APCO single in air handler
B
APCO dual in air handler
C
APCO single in Furnace
D
APCO dual in Furnace
A
B
Furnace
C
D
2nd UV Lamp
A
Q
WARNING
H
I
J
K
L
O
P
D
E
F
G
B
M
C
N
WARNING
1
Parts List
Note: lamp
M
or
N
and parts
O P Q
are included with APCO RT Dual.
*Note: only one lamp and one power supply are included with APCO RT.
A
APCO RT Main Unit
B
RT UV Lamp 1 Year*
C
RT UV Lamp 2 Year*
D
ER Power Supply*
E
ST/DT Power Supply*
F
SI/DI Power Supply*
G
Duct Mounting Template
H
Self-tapping Screws
I
Quick Nut (plastic)
J
Tap-in Connector
K
Spade Connector
L
Duct Rivet
M
Optional Remote
UV Lamp 1 Year
N
Optional Remote
UV Lamp 2 Year
O
Sight Glass
P
“Z” Mounting Bracket
Q
Warning Sticker
TUV-APCO-RT-MAN 2.11.13
© 2012 Fresh-Aire UV
US patent #7,704,463