Fresh-Aire UV APCO RT Скачать руководство пользователя страница 1

APCO RT is installed in the ductwork of the central 

air system to reduce odors and airborne biological 

contaminants for improved indoor air quality. APCO RT 

also reduces microbial growth within the air system.

IMPORTANT!

•  Only qualified technicians should install this product
•  Install in accordance with relevant building codes
•  Read instructions carefully including safety warnings

Important:

 some materials inside the air system (including filter media, 

flex duct, wiring etc.) may not be UV light resistant. Use the optional UV 

shield (part #TUV-SHIELD-LP) or cover the materials with reflective tape.

WARNING

PROTECT EYES FROM UV LIGHT

TURN OFF UNIT OR DISCONNECT

BEFORE SERVICING

G

3

 

Cut Hole In Duct Using Template

Cut hole in duct using a cutting tool 

appropriate for the duct material.

Use scissors to cut out center of 

paper template (pick circular or 

linear). Trace cut-line onto duct 

using template.

Air Handler

2nd UV Lamp

2

 Installation Notes

APCO RT is usually installed on the supply side 

duct just above the air system but can also be 

installed on the return side if necessary. 

The APCO RT unit should be oriented so that 

the  air flows past the 

UV Light

 first then into 

the 

Matrix Element.

If a second optional UV lamp is used (APCO 

RT Dual) select a location inside the air system 

that will allow it to shine on the greatest 

surface area or the area with the most evident 

microbial growth. To install the secondary UV 

light use the 

Optional 2nd Remote UV Light 

Installation Instructions

 provided with APCO 

RT Dual. 

Typical installations include:

A

 APCO single in air handler

B

 APCO dual in air handler

C

 APCO single in Furnace

D

 APCO dual in Furnace

A

B

Furnace

C

D

2nd UV Lamp

A

Q

WARNING

H

I

J

K

L

O

P

D

E

F

G

B

M

C

N

WARNING

1

 Parts List

Note: lamp 

M

 or 

N

 and parts 

O P Q

are included with APCO RT Dual.

*Note: only one lamp and one power supply are included with APCO RT.

A

 APCO RT Main Unit

B

 RT UV Lamp 1 Year*

C

 RT UV Lamp 2 Year*

D

 ER Power Supply*

E

 ST/DT Power Supply*

F

 SI/DI Power Supply*

G

 Duct Mounting Template

H

 Self-tapping Screws

I

 Quick Nut (plastic)

J

 Tap-in Connector

K

 Spade Connector

L

 Duct Rivet

M

 Optional Remote  

      UV Lamp 1 Year

N

 Optional Remote  

      UV Lamp 2 Year

O

 Sight Glass

P

 “Z” Mounting Bracket

Q

 Warning Sticker

TUV-APCO-RT-MAN 2.11.13

© 2012 Fresh-Aire UV

US patent #7,704,463

Отзывы: