FSB# 15-HOM-001 Rev. A
Page 1 of 7
Fresenius Medical Care North America
Service Bulletin
Equipment:
2008K@Home
™
Hemodialysis Machines
Bulletin:
15-HOM-001 Rev A
Subject:
Optional Shunt Box Ferrite Core Installation (Update)
1.0 PURPOSE
To inform all Facilities, Field Service and Technical Support personnel of how to replace the
shunt box wire harness (which includes a ferrite core) for ESD related “Dial Valve Failure 1”
alarms on a 2008K@Home Hemodialysis machine. This Service Bulletin replaces
FSB# 08-HOM-002.
2.0 PARTS REQUIRED
Figure 1
– Shunt Switch Assembly (P/N M42408)
3.0 REQUIRED TOOLS
#1 Phillips Screwdriver
Masking tape or equivalent
#2 Phillips Screwdriver
5mm Hex (Allen) Wrench
4.0 INSTRUCTIONS
4.1
Stabilize the machine by applying the caster brake.
4.2
Remove any items hanging on the I.V. pole.
4.3
Locate and remove the screw attaching the I.V. pole to
its mounting base using a 5mm Hex (Allen) Wrench.
See Figure 2 for screw location.
4.4
Slide the I.V. pole up and out of the shunt box.
© 2015, Fresenius Medical Care North America, All rights reserved.
Figure 2
I.V. Pole Mounting
Screw Location