4.
INSTALLATION
4.1.
Requirements for installation the freezer
Installation of the unit must be performed following next requirements:
•
The unit must be aligned horizontally (both depth and length) and installed in
the stable position.
•
Set up the unit only on the designated adjustable legs.
•
It is forbidden to install the unit close to any heating equipment or any HVAC
elements (air outlet etc.).
•
Keep a sufficient distance around the unit. It must be possible to open the doors
without any obstructions.
Fig. 7.
Example of unsuitable ambient conditions
Содержание VEGA SPACE QB
Страница 1: ...OPERATION MANUAL SERVE OVER VEGA SPACE QB FREEZER...
Страница 6: ...6 1 2 Dimensions Fig 2 Dimensions of Vega Space QB Freezer LU...
Страница 13: ...13 Install the plastic legs Lower the serve over...
Страница 16: ...16 Apply the foam tape around perimeter of connection Apply silicone to seal the perimeter of connection...
Страница 17: ...17 Push the serve overs together With help of a level check if both serve overs are horizontal...
Страница 20: ...20 River the connection plate on the back of the connection Rivets D4 8x10 Example of installed serve overs...