background image

 

30 

 

13.

 

ENERGY SAVING 

The serve-over can be supplied with a door or mechanical night curtains. This option 
is available on request. During non-business hours of the shop, an open serve-over 
be closed with night curtains (if present). Make sure that products arrangement does 
not disturb to close the curtain. If the cabinet is with doors, make sure that the doors 
are fully closed. The lighting of the serve-over must be turned off.  

14.

 

DISPOSAL 

A used serve-over can be restored and reused. If it is necessary to completely stop 
the operation of the refrigerated cabinet, the following steps must be taken: 

 

Turn off the power supply. 

 

Disconnect of the glycol piping. 

 

Collect the refrigerant from the freezing coil. 

 

The elements of the refrigerated cabinet require specific disposal; therefore, it 
is necessary to contact organizations that dispose of certain types of materials. 

15.

 

STORAGE 

If temporary storage and subsequent use of the serve-over is expected (during repair 
of the shopping premise or change location of the cabinet), the equipment must be 
stored in a well-ventilated room with temperature higher than 0

°C

. It is forbidden to 

leave the cabinets outdoors. It is necessary to put on cover the serve-over or to make 
other structures protecting the unit against external damage.  

16.

 

TESTING 

Each refrigerated cabinet is factory tested. During the testing, the following checks 
are carried out: 

 

Hermetic tightness. 

 

Pressure tests of the freezing coil. 

 

Checks of electrical installation. 

 

Load tests. 

After the serve-over are installed, each serve-over and the overall system must be 
inspected before their start-up.  

17.

 

ACCESSORIES 

Variety of special accessories available on request, such as: partitions, tabs,  price 
holders, a drainage collection tub, evaporation baths, safety bumpers, etc. For more 
information, please call FREOR LT or sales partner. 

Содержание VEGA QB HG

Страница 1: ...OPERATION MANUAL SERVE OVER VEGA QB LG HG...

Страница 2: ...closing the doors 11 2 8 Recommended working conditions and ambient temperature 11 2 9 Purpose of use 12 3 UNPACKING 12 4 INSTALLATION 15 4 1 Requirements for installation the serve over 15 4 2 Insta...

Страница 3: ...Cleaning 28 12 INNER LIGHTING 29 13 ENERGY SAVING 30 14 DISPOSAL 30 15 STORAGE 30 16 TESTING 30 17 ACCESSORIES 30 18 TECHNICAL DATA 31 18 1 Electrical layouts 31 18 2 Failures and troubleshooting 31 1...

Страница 4: ...turer information Manufacturer address FREOR LT UAB Katiliskiu St 92 LT 02212 Vilnius Lithuania T 370 5 232 9188 EN Made in Lithuania Customer Installation date Installation place Start of the product...

Страница 5: ...ver Fig 1 Fig 1 Example of sticker Intention of this document is to provide information about maintaining and operating of the serve over Vega QB LG HG In accordance with the EU Directive the refriger...

Страница 6: ...6 1 2 Dimensions Fig 2 Dimensions of Vega QB HG TD Fig 3 Dimensions of Vega QB LG TD...

Страница 7: ...7 Fig 4 Dimensions of Vega QB HG LU Fig 5 Dimensions of Vega QB LG LU...

Страница 8: ...en properly set up and installed and has no obvious defects Do not make any technical changes to the appliance Do not store any explosive substances such as aerosol containers with flammable propellan...

Страница 9: ...not expose the unit to temperatures higher than 70 C during transportation and storage Avoid transmitting pulsations and vibrations to the unit Do not allow external forces to act on the appliance e...

Страница 10: ...setup and installation Protection from contact with liquid leaking refrigerant in the event of leakage in the refrigerant circuit Protection from low temperature during loading and cleaning For remov...

Страница 11: ...fault messages or damage to the appliance contact the maintenance service 2 7 Opening closing the doors Hand or other body parts may become caught on side of door hinge When opening closing the door...

Страница 12: ...iry products delicacies ready made food snacks sandwiches green salad game salad with mayonnaise sauce cooked meat products eggs and their products sauces 4 C Household poultry minced meat and product...

Страница 13: ...3 x 2 Size 17 15 min Use appropriate equipment for unit transportation refer to unit weight and dimension information Lift the serve over Remove pallet s screws Remove the pallet Screws M6x100 ISO 738...

Страница 14: ...14 Install the plastic legs Lower the serve over...

Страница 15: ...ly both depth and length and installed in the stable position Set up the unit only on the designated adjustable legs It is forbidden to install the unit close to any heating equipment or any HVAC elem...

Страница 16: ...n of Vega QB LG HG X2 Size 17 32 PH2 Using the front and rear legs perform horizontal and vertical pre adjustment of the serve over The legs are adjustable up to 5 cm Apply the foam tape around perime...

Страница 17: ...17 Apply silicone to seal the perimeter of connection Push the serve overs together...

Страница 18: ...18 With help of a level check if both serve overs are horizontal All 4 connection slot positions in the figure...

Страница 19: ...19 Front connection slot position Connection slots are fixed together with threaded pins M10x90 ISO 7985 Remove the back decoration...

Страница 20: ...20 Back connection slot position Connection slots are fixed together with threaded pins M10x90 ISO 7985 River the connection plate on the back of the connection Rivets D4 8x10...

Страница 21: ...21 Example of installed serve overs...

Страница 22: ...22 5 INSTALLATION OF DUST COVERS X1 PH2 15 min Fix the front dust cover with self tapping screws D4 2x13 Fix the rear dust covers and cover connector with self tapping screws D4 2x13...

Страница 23: ...23 Fix the side dust covers with self tapping screws D4 2x13 6 INSTALLATION OF LEG PANELS X1 PH2 15 min Attach the front panel to the leg...

Страница 24: ...24 Fix the sides of the panel with self tapping screws D4 2x13 Fix the back panel with self tapping screws D4 2x13 fd...

Страница 25: ...13 Hex 4 5 15 min To adjust the angle of the stand slightly loosen the bolts indicated on the left of figure above Adjust the stand angle by rotating the bolts indicated on the right of figure above...

Страница 26: ...5 min To adjust the angle and the height of the stand slightly loosen the bolts indicated on the left of figure above Adjust the stand angle and height by rotating the bolts indicated on the right of...

Страница 27: ...fore connecting the unit Applicable local electrical safety regulations The power supply voltage and frequency must match the specifications on the technical data sticker Do not connect a damaged unit...

Страница 28: ...e the temperature in the control Products must be uploaded into the cooled inner space of the serve over 11 2 Defrosting Warm ambient air can get into the serve over It is very likely when the showcas...

Страница 29: ...aning Deep cleaning of the serve over must be performed once every 4 weeks The serve over must be cleaned and disinfected to eliminate pathogenic microorganisms Make sure that defrosting is in progres...

Страница 30: ...ations that dispose of certain types of materials 15 STORAGE If temporary storage and subsequent use of the serve over is expected during repair of the shopping premise or change location of the cabin...

Страница 31: ...serve over check the refrigerant amount and replacement of parts may only be carried out by a specialist qualified to work with F and OAM gases Only an electrician with the respective qualification ma...

Страница 32: ...ination of the freezing coil Damage of the tightness of the freezing coil Failure of the control valve TRV ERV Leakage of the refrigerant Call the refrigeration technician service department Defrostin...

Страница 33: ...elements can be operational Check switches Check the power network The compressor is out of order Refrigeration cycle malfunction Signals of the pressure sensors Fluctuations of the electrical network...

Страница 34: ...SYMBOLS Symbol Meaning Type Qualified specialist Work clothing Protective gloves Brittle surfaces Wrench Sizes 10 13 17 32 Screwdriver PH2 Rubber hammer 1 Protective goggles Silicone pistol 1 Clamp 2...

Страница 35: ...35 Date Work Name...

Страница 36: ...ufacturer of the commercial refrigeration equipment Katiliskiu St 92 LT 02212 Vilnius Lithuania T 370 5 232 9188 E sales freor com www freor com DOM 2AB0X 00000E_v1 0 FREOR LT is not affiliated with C...

Отзывы: