The Initial Maintenance table lists all maintenance
operations that are to be performed at the initial
maintenance (IM) interval. Maintenance operation
numbers are reference numbers used to help you
find detailed instructions in this manual on the main-
tenance operations to be performed. All operations
listed in the table, along with the operations listed in
the applicable M1 maintenance interval table, must
be performed to complete the initial maintenance
(IM).
Maintenance
Operation Number
Initial Maintenance (IM) Operations for Service Schedules I, II, III, and IV
Check
Perform all M1 Operations
Frame Fastener Torque Check
Premier 690 Coupling Inspection
Suspension U-Bolt Torque Check
All-Axle Alignment Check
Wheel Nut and Rim Nut Check
Fuel Tank Band-Nut Tightening
Table 9, Initial Maintenance (IM) Operations for Service Schedules I, II, III, and IV
General Information
00
Initial Maintenance (IM) Operations: 00–05
Century Class Trucks Maintenance Manual, August 2017
00/10
Содержание Argosy COE 2011
Страница 1: ...Maintenance Manual CENTURY CLASS STI 341 1 A24 00691 000...
Страница 3: ......
Страница 5: ......
Страница 11: ......
Страница 33: ......
Страница 35: ......
Страница 41: ......
Страница 43: ......
Страница 45: ......
Страница 47: ......
Страница 49: ......
Страница 53: ......
Страница 63: ......
Страница 67: ......
Страница 69: ......
Страница 77: ......
Страница 79: ......
Страница 91: ......
Страница 103: ......
Страница 111: ......
Страница 113: ......
Страница 123: ......
Страница 125: ......
Страница 129: ......
Страница 135: ......
Страница 149: ......
Страница 159: ......
Страница 161: ......
Страница 165: ......
Страница 167: ......
Страница 175: ......
Страница 179: ......
Страница 183: ......
Страница 191: ......
Страница 193: ......