Chapter 2 Installation and Configuration
Mounting the Rail Kit
16
SuperLoader 3 Autoloader User’s Guide
Mounting the Rail Kit
2
For instruction on mounting the autoloader in a standard 19-inch rack,
see
Installing and Removing the Optional V-Rail Kit
on page 95.
Connecting the SCSI and Power Cables
2
To connect the SCSI and power cables to the autoloader, follow these
steps:
1
Shut down and turn off the selected server. Turn off all attached
accessory devices, such as printers and other SCSI devices.
2
Attach one end of the SCSI cable (included in the accessory kit) to one
of the connectors on the back panel of the autoloader.
3
Attach the other end of the SCSI cable to the connector on the SCSI
host adapter or to the connector on the previous device on the SCSI
bus.
Содержание Quantum SuperLoader 3
Страница 9: ...Contents SuperLoader 3 Autoloader User s Guide ix Index 205...
Страница 10: ...Contents x SuperLoader 3 Autoloader User s Guide...
Страница 22: ...Chapter 1 Introduction Overview 4 SuperLoader 3 Autoloader User s Guide...
Страница 40: ...Chapter 2 Installation and Configuration Installing the Device Drivers 22 SuperLoader 3 Autoloader User s Guide...
Страница 58: ...Chapter 3 Operating the Autoloader Data Compression 40 SuperLoader 3 Autoloader User s Guide...
Страница 76: ...Chapter 4 On board Remote Management Commands Page 58 SuperLoader 3 Autoloader User s Guide...
Страница 98: ...Chapter 6 Diagnostics On board Remote Management Diagnostic Tests 80 SuperLoader 3 Autoloader User s Guide...
Страница 178: ...Appendix A Specifications Tape Drive Specifications 160 SuperLoader 3 Autoloader User s Guide...
Страница 204: ...Event Error Logs SDLT600 only 186 SuperLoader 3 Autoloader User s Guide...
Страница 230: ...Index 212 SuperLoader 3 Autoloader User s Guide...