5
3. Connect the solenoid wiring to the field wiring using wire nuts to secure the connections. Replace
the explosion proof junction box cover.
4. Connect the vacuum sensor wiring to the IS field wiring using epoxy wire seals to secure the
connections. Replace the IS junction box cover.
5. Install the supplied Siphon Check Valve with the inscribed Flow Arrow pointing to the STP. Apply
a non-hardening, thread sealing compound to the threads, then thread the valve body into the
submersible turbine’s siphon port. If necessary, use a FFS Secondary Syphon Assembly to connect
the TS-SCM to the syphon port of the STP.
Secondary Syphon
Assembly
STP
STP
Connect to TS-
SCM
Connect to TS-
SCM
6. Plumb the siphon hose from the VAC port of the TS-SCM to the siphon check valve. Secure the
hose to the fittings using one of the supplied hose clamps at each end.
7. Plumb the containment vacuum hose from the in-line air filter barb to the containment area to be
monitored. Secure the hose to the air filter using one of the supplied hose clamps per air filter. Install
Tee-fittings and clamps where necessary to connect the hoses if more than one containment area
will be monitored as a group.
NOTE:
The containment vacuum hose must be placed in the lowest point of the containment space.
For double walled tanks, this means ensuring that the vacuum line rests at the bottom most part
of the tanks interstitial space. Use the same industry procedures used to install any sensor at the
bottom of a double walled tank.
NOTE:
Installation kits include connections for both Schrader valve and push fit connections. The
push fit stub must be secured to the tubing with a band clamp.
Содержание TS-SCM
Страница 1: ...TS SCM SECONDARY CONTAINMENT MONITORING INSTALLATION GUIDE...
Страница 35: ...31 0539 II 1 G Ex ia Ga IIA DEMKO 05 ATEX 0430464X IECEx UL 05 0013X...
Страница 38: ...INTENTIONALLY BLANK...
Страница 39: ...INTENTIONALLY BLANK...
Страница 40: ...000 0528 r7...