2
APPLICATIONS
The following diagram illustrates a typical installation in an STP sump.
Tank
Containment
Install Kit
Vacuum Sensor
Integral Solenoid
Product Pipe
Double Wall
APT
Test
Boot
APT
Syphon
Check Valve
TS-LSU500
Pump
Submersible
FE Petro
TS-SCCM/2
High Voltage Conduit
Intrinsically
Safe Conduit
To Bottom
of Tank
SITE REQUIREMENTS
Total Containment Volume*
Minimum - 0.25 gallons (1 L)
Maximum - 500 gallons (1879 L)
Normal Operating Vacuum
2" – 6" Hg (1 – 3 PSIG)
Pre-Programmed Maximum Shutdown
(Alarm Condition)
9" Hg (4.5 PSIG)
Mechanical Relief Valve Vacuum**
10" Hg (5 PSIG)
Jumper Tubing
Use only supplied vacuum tubing
Vacuum Sensor Wiring
Belden No. 87761(0.12" OD) to 400 ft.
Belden No. 89182(0.31" OD) to 500 ft. (maximum distance)
Solenoid Wiring
600 V, 18 AWG minimum, UL approved.
Refer to ANSI/NFPA70 or CEC electrical codes
*Refer to manufacturers’ documentation to calculate containment area volumes.
**All containment areas MUST be compatible with the vacuum levels listed.
IMPORTANT:
The system should be tested annually after installation.
The term “containment” (as in “secondary containment”) refers to the interstitial spaces of double walled
piping, sumps, and tanks that serve as a secondary restraining space if the primary containment is
damaged.
Содержание TS-SCM
Страница 1: ...TS SCM SECONDARY CONTAINMENT MONITORING INSTALLATION GUIDE...
Страница 35: ...31 0539 II 1 G Ex ia Ga IIA DEMKO 05 ATEX 0430464X IECEx UL 05 0013X...
Страница 38: ...INTENTIONALLY BLANK...
Страница 39: ...INTENTIONALLY BLANK...
Страница 40: ...000 0528 r7...