5.  Connect the motor leads to M1 and M2, and connect the ground wire to the terminals as 

shown in the "SPGC-220 Stand Alone wiring diagram."

6.  Connect the Dispenser Hook Signal to the terminals, 120-240 VAC Supply, and Return 

according to the "SPGC-220 Stand Alone wiring diagram" or "SPGC-220 Primary-Secondary 
wiring diagram" (whiche
ver is appropriate). The hook signal can come from a dispenser, 
isolation relay, or STP-DHI. For more information, refer to the "STP-DHI Installation and 
Owner's Manual" (part number 223844101).

7.  If you are setting the controller to the stand alone configuration, make sure the SW1 and 

SW2 poles 1-8 are set according to the "SPGC-220 Stand Alone wiring diagram." (The Stand 
Alone configuration is the factory default setting.) For Primary-Secondary or Alternating 
Circuit (AC) configurations, please see the "SPGC-220 Primary-Secondary/Alternating Circuit 
wiring diagram."

Primary-Secondary/Alternating Circuit

The Primary-Secondary feature (see the "SPGC-220 Primary-Secondary wiring diagram") allows 
you to turn on additional STPs when there is an abnormal condition or an STP needs help due 
to loading (flow rate). The AC feature (see the "SPGC-220 Alternating Circuit wiring diagram"
continuously alternates the lead pump, so it turns on a different STP each time all dispenser hook 
signals are shut off and at least one dispenser hook signal turns back on. The Primary-Secondary/
AC configuration (see the "SPGC-220 Primary-Secondary/Alternating Circuit wiring diagram"
combines the features of Primary-Secondary and AC.

 

CAUTION

: Line leak detection performance can be affected when you use multiple  

SPGC-220s. FFS does not recommend using the AC feature in conjunction with electronic line 
leak detection. Some electronic line leak detector manufacturers require the Primary to always 
be turned on first. Please refer to the manufacturer’s requirements.

NOTE: 

The SPGC-220 is compatible with the STP-SCI in Primary-Secondary or AC configurations.

NOTE:

 Wiring diagrams are in the "Wiring Diagrams" section of the "Troubleshooting" chapter.

1.  Connect the communication cable to the RS 485 terminals (+/A, G/GND, -/B) and wire “+” 

together, “G” together and “-“ together then wire the shielded cable drain wire to Ground 
(G) at one end only. Use at least 22 AWG three conductor shielded cable with drain wire.

2.  Make sure the Dispenser Hook Signal is connected to the SPGC-220 designated as Primary 

according to the "SPGC-220 Primary-Secondary wiring diagram" the "SPGC-220 Alternating 
Circuit wiring diagram"
 and the "SPGC-220 Primary-Secondary/Alternating Circuit wiring 
diagram."
 The hook signal can come from a dispenser, isolation relay, or STP-DHI. For 
more information, refer to the "STP-DHI Installation and Owner's Manual" (part number 
223844101).

NOTE: 

Make sure L1, L2, M1, M2 and grounds are installed at each SPGC-220.

3.  Configure Primary-Secondary and AC features by setting SW2 poles 3 and 4 according to the 

"Switch definitions" table.

Содержание GUARDIAN SPGC-220.

Страница 1: ...GUARDIAN SERIES TM SINGLE PHASE CONTROLLER INSTALLATION GUIDE...

Страница 2: ...of third parties that may result from use of this manual or the products We make no warranty of any kind with regard to this material including but not limited to the implied warranties of merchantab...

Страница 3: ...e 8 9 Fault Shutdown Mode SW2 Pole 1 9 Extended Run Disable SW2 Pole 5 9 DEF Mode SW2 Pole 6 9 Calibration 10 Calibration steps 10 Troubleshooting 11 Disabling the audible alarm 11 Reset11 Selectable...

Страница 4: ...e 60 Hz wiring 25 DEF PMA150B Single Phase 50 Hz wiring 26 DEF PMA150C Three Phase 50 Hz wiring 26 SPGC 220 Stand Alone wiring diagram 27 SPGC 220 Primary Secondary wiring diagram 28 SPGC 220 Alternat...

Страница 5: ...that could result in minor or moderate injury if not avoided This may also be used to alert against unsafe practices WARNING This indicates a potentially hazardous situation that could result in seve...

Страница 6: ...e designed to trap hazardous liquid spills and prevent environmental contamination so they can accumulate dangerous amounts of hydrocarbon vapors Check the atmosphere in the sump regularly while you a...

Страница 7: ...ation Supply input rating 200 250 VAC 50 60 HERTZ 14 5 AMPS Motor contact rating 200 250 VAC 50 60 HERTZ 2 HP 1 5 KW Switch hook rating 120 240 VAC 50 60 HZ 16 mA Supply motor wiring 10 14 AWG 300 V m...

Страница 8: ...4 Intentionally Blank...

Страница 9: ...e sure you provide them to anyone who services this equipment NOTE Wiring diagrams are in the Troubleshooting chapter of this manual 1 Install the STP according to its installation documentation IMPOR...

Страница 10: ...rns back on The Primary Secondary AC configuration see the SPGC 220 Primary Secondary Alternating Circuit wiring diagram combines the features of Primary Secondary and AC CAUTION Line leak detection p...

Страница 11: ...f Off On Secondary 18 Off On Off Off On Secondary 19 On On Off Off On Secondary 20 Off Off On Off On Secondary 21 On Off On Off On Secondary 22 Off On On Off On Secondary 23 On On On Off On Secondary...

Страница 12: ...lers to shut down 2 Address 1 2 Unused The default position is ON 3 Address 2 3 Primary Secondary ON designates the SPGC 220 as the Primary controller This switch must be set to OFF for Secondary and...

Страница 13: ...l condition is corrected and you manually reset or power cycle the controllers The fault shutdown is required if you are using a Veeder Root PLLD in a Primary Secondary configuration By deafult SW2 Po...

Страница 14: ...DEF MODE if applicable The factory default is SW2 Pole 6 OFF for petroleum pump motor assemblies Calibration steps 1 Close either the STP clamp valve or a ball valve at the STP discharge attach the co...

Страница 15: ...l Support for assistance If the display is flashing and the audible alarm is beeping there is an abnormal condition Note the flashing code on the display and refer to the appropriate troubleshooting t...

Страница 16: ...ON position the controller operates as a standard relay control box It will not indicate or shut down due to an abnormal condition with the exception of an over current condition The bypass mode is a...

Страница 17: ...a clogged intake or improper calibration Is the level less than 8 inches Press and hold the Reset button until the display goes blank and then release the button Determine the fuel level in the stora...

Страница 18: ...14 Underload Error alarm continued Deactivate the hook signal and Bypass Mode Recallibrate the controller Contact FFS Tech Support Monitor for proper operation Was the callibration successful A No Yes...

Страница 19: ...hen the incoming voltage returns to the acceptable range LI resets above 200V and HI resets below 245V Does the controller go into the LI error code Is the voltage between 200 and 250 VAC A No Yes Yes...

Страница 20: ...oltage equal the measured voltage within 10VAC Was the calibration successful Use the ATG Control Pumps menu to determine what the calibrated voltage of the SPGC 220 was Monitor for proper operation C...

Страница 21: ...a locked PMA rotor due to debris or damage or improper calibration Was the PMA replaced with a new PMA of the same horsepower Press and hold the Reset button until the display goes blank Release the...

Страница 22: ...wrench to manually spin the PMA rotor Replace the PMA and reinstall the extractable Does the motor spin freely Yes No Contact FFS Tech Support Turn on power to the smart controller Recalibrate the SP...

Страница 23: ...mal overload due to a locked rotor event Press and hold the Reset button Release the button when the display goes blank Monitor for proper operation Use an Ohmmeter on its lowest setting to measure th...

Страница 24: ...wiring is correct Refer to SB003 for a wiring diagram Seal the junction box Use an ohmmeter to measure the resistance of the red wire to the black wire the red wire to the orange wire and the black wi...

Страница 25: ...tors Correct or replace them as needed Activate the circuit breaker Seal all open STP junction boxes Activate the hook signal and monitor its operation Monitor for proper operation Lock and tag out ci...

Страница 26: ...t be calibrated before they can be used See Calibration in the Installation chapter of this manual for the calibration procedure Was the calibration successful Go to the troubleshooting topic for the...

Страница 27: ...xtended run disable switch SW2 pole 5 to ON Measure for voltage across the hook terminals No Does the application require the STP to run at constant flow rates for at least 60 minutes Yes Yes Monitor...

Страница 28: ...relay contact failure Press and hold the reset button until the error code lights dim Lock out and tag out the circuit breaker Release the reset button Replace the smart controller relay board Reacti...

Страница 29: ...N NOTE The lockout switch is not a substitute for properly locking out and tagging out the electrical circuit when you service this equipment NOTE You can install the single phase DEF PMA capacitor ne...

Страница 30: ...Hz 208 240 Volts NOTE The lockout switch is not a substitute for properly locking out and tagging out the electrical circuit when you service this equipment NOTE You can install the single phase DEF P...

Страница 31: ...27 SPGC 220 StandAlone wiring diagram...

Страница 32: ...28 SPGC 220 Primary Secondary wiring diagram...

Страница 33: ...29 SPGC 220Alternating Circuit wiring diagram...

Страница 34: ...SPGC 220 Primary Secondary Alternating Circuit wiring diagram...

Страница 35: ...SPGC 220 replacement parts Lower power relay board Part 225005932 Upper control user input board Part 225000932...

Страница 36: ...223987103 r3...

Отзывы: