background image

©2013 FFS 400289002 Rev. 9

 

 

19.  Connect power to the submersible pump at the electrical supply box. 

20.  Test proper operation by dispensing product into calibration can. 

21.  Turn off the dispenser switch.  Feel the submersible pump, to make sure that the pump has stopped running. 

Note: 

If the pump does not turn off when the dispenser switch is turned off, this may indicate an electrical problem in the 
dispenser or other wiring error or malfunction.  Call this to the immediate attention of a qualified electrician. 

22.  Visually check for leaks on the manifold head during pump operation and after. 

23.  To ensure that the STP is providing proper line pressure, install a pressure gauge in the line test port.  Turn on the 

STP and, while it’s running, the pressure should be above 24 psi (1.65 bar) (PMA size will affect psi).  Turn off the 
STP and verify that the line pressure is holding.  Remove the pressure gauge, replace the plug, turn on the STP and, 
again, visually check for any leaks. 

24.  If any leaks are observed, line pressure isn’t correct, or any other problems or concerns occur, call FFS Technical 

Support at 1-800-225-9787. 

25.  Fill out the Warranty Registration Card and return it to Franklin Fueling Systems. 

Note: 

If a STP or an IST does not operate correctly or there are any questions concerning installation or service, please 
contact FFS Technical Services at (800) 225-9787.

 

 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Содержание FE PETRO PMA 75

Страница 1: ... 2013 400289002 Rev 9 Franklin Fueling Systems 3760 Marsh Rd Madison WI 53718 USA Tel 1 608 838 8786 800 225 9787 Fax 1 608 838 6433 www franklinfueling com Pump Motor Assembly Replacement Instructions ...

Страница 2: ...ly follow NFPA codes 30 30A and 70 from the National Fire Protection Association Failure to follow these codes could result in severe injury death serious property damage and or environmental contamination Always secure the work area from moving vehicles The equipment in this manual is usually mounted underground so reduced visibility puts service personnel working on this equipment in danger from...

Страница 3: ...nd washers from the new PMA kit leaving the new gasket in place on the PMA Note Be sure the new gasket is used because the gasket on some competitive PMA s will block the flow of product through the motor This blockage will prevent proper cooling and lubrication of the motor and bearings and lead to shorter motor life 11 Apply grease from the small grease tube provided to the mating pieces on the ...

Страница 4: ...d after 23 To ensure that the STP is providing proper line pressure install a pressure gauge in the line test port Turn on the STP and while it s running the pressure should be above 24 psi 1 65 bar PMA size will affect psi Turn off the STP and verify that the line pressure is holding Remove the pressure gauge replace the plug turn on the STP and again visually check for any leaks 24 If any leaks ...

Отзывы: