This kit is for use with Healy Model 600 Series Nozzle only

Follow all federal, state and local 

laws governing the installation of this 

product and its associated systems. 

When no other regulations apply, follow NFPA 

codes 30A and 70 from the National Fire Protection 

Association. Failure to follow these codes could result 

in severe injury, death, serious property damage and/

or environmental contamination. 
Always lock out and tag electrical circuit breakers 

while installing or servicing this equipment and any 

related equipment. 

G4 Nozzle

Vaporguard Removal

The vaporguard must be removed prior to beginning the 

600 Nozzle spout replacement procedure.

1.  Unscrew and loosen the vaporguard clamp.  If the 

clamp is an Oetiker type, slip a small screwdriver 

under the overlap tab on the bottom and pry up 

past the locking tab.

2.  Rotate the vaporguard back and forth a maximum 

of 5º in each direction and pull to separate the 

vaporguard from the nozzle.

Figure 1: G4 Nozzle with Vaporguard

Spout Replacement

Use a Phillips screwdriver to remove the #8 

1. 

panhead screw (Healy Part No. 6102) holding the 

spout in place.
With the screw removed, use a maximum rotation 

2. 

of 15º in each direction to separate the nozzle and 

the spout. Three O-rings should come out with 

the spout.  If not, check to see if the O-rings are 

trapped inside the nozzle.  

Note:

  There is an additional o-ring inside the nozzle in a 

separate groove. This must be left in place.

Install new (not used) O-rings on the replacement 

3. 

spout and lubricate the O-rings with oil.  
Carefully insert the spout into the nozzle, lightly 

4. 

pushing both parts together until the spout aligns 

itself and resistance is felt.
Use a maximum twisting motion of 15º and light 

5. 

pressure to slide the two components together, 

seating the O-rings and aligning the screw threads 

in the spout housing with the hole in the nozzle 

casting.
Use the new #8 panhead screw and the new 

6. 

O-ring, provided with the replacement spout, to 

secure the spout in place.
Tighten securely to 12 inch-pounds.

7. 

Vaporguard Replacement

Slide the vaporguard over the spout. Use a 

1. 

pushing / twisting motion of no more than 5º in 

either direction to slide the vaporguard onto the 

nozzle.
Install a vaporguard clamp and tighten it securely.

2. 

Verify that the “HEALY” logo on the vaporguard is 

3. 

aligned with the top center of the nozzle.

Testing

Dispense a small amount of product into a 

1. 

container deep enough to cover the small hole 

near the tip of the spout.
Immerse the spout until the hole is covered and 

2. 

attempt to dispense product. The nozzle should 

shut off.  Repeat this step three times to be 

assured that the auto shut-off feature is working 

properly.  There should be no sluggishness to the 

shut off: it should be quick and positive. If shut off 

does not occur, turn off the dispenser, remove the 

spout, and check the O-rings.